Supercomputers/Systems/HUMAIN Qualcomm AI 100 Cluster
Saudi Arabia · under construction · ai inference
HUMAIN Qualcomm AI 100 Cluster
Also known as HUMAIN Qualcomm inference racks
Operated by HUMAIN .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Qualcomm full-stack AI racks delivered to HUMAIN | Qualcomm | - | Reported | middleeastainews.com |
| Accelerator | - 1,024 Qualcomm Cloud AI 100 Ultra accelerators in phase one | Qualcomm | 1,024 reported | Reported | middleeastainews.comtomshardware.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| IT power | 200 MW | 2025-10 | Design target | HUMAIN targets 200 MW of Qualcomm AI200/AI250 rack capacity starting 2026; Register notes AI250 is not available until 2027. Not in capacity_claims. | theregister.comblackridgeresearch.com |
| Rack power | 160 kW | 2025-10 | Design target | Qualcomm AI200/AI250 rack-level power consumption of 160 kW as specified by Qualcomm; product spec, not a measured value at HUMAIN. | theregister.comblackridgeresearch.com |
Compute deals
- 2025-10-28: HUMAIN and Qualcomm (chip supply , 200 MW). de.tradingview.commiddleeastainews.com
All compute deals. Headline values are as announced, not additive.
The read
HUMAIN's inference data centre built on Qualcomm Cloud AI 100 Ultra racks, announced in October 2025 with 1,024 accelerators in phase one; delivery was reported in February 2026, with Adobe named as first customer. Both pages are trade press working from Qualcomm and HUMAIN announcements, and Tom's Hardware calls the 1,024 'systems' where the Middle East AI News report says accelerators, so the unit is taken as accelerators and the tier is reported. Neither page names the site, so it is left unlocated. The 200 MW target quoted for the wider Qualcomm and HUMAIN programme is not recorded as a capacity claim because it is not tied to this phase. Separate from HUMAIN's NVIDIA-based AI Factory Phase 1.
Timeline
- 2025-10 Announced source
Change history
- 2026-10-04 Added AI datacenter metrics for humain-qualcomm-ai100
- 2026-10-02 Added HUMAIN's Qualcomm AI 100 inference cluster
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| middleeastainews.com | names system only | - |
| tomshardware.com | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.