Supercomputers/Systems/Nebius Rotterdam (Volt)
Netherlands · planned · ai training
Nebius Rotterdam (Volt)
Also known as Volt Rotterdam AI campus
Operated by Nebius at Volt Rotterdam Campus Site .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Nebius first offtaker under a letter of intent for 600 MW in six buildings | Nebius | - | Reported | baxtel.com |
| Integrator | - Volt develops the Rotterdam campus, first phase two 100 MW data centres | Volt | - | Reported | baxtel.com |
| Power | - Eneco supplies offshore wind electricity to the campus | Eneco | - | Reported | baxtel.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Stated investment | 7.8 USD bn | 2026-10 | Operator stated | First phase about 7 billion euros including construction and computing hardware; a letter of intent, not a final budget | baxtel.com |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Wind and solar | Eneco | - | planned | 2026-10 | Operator stated | Electricity from nearby offshore wind farms supplied by Eneco; MW not stated | baxtel.com |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
The read
Nebius signed a letter of intent in October 2026 to be first offtaker of Volt's planned Rotterdam campus: 600 MW across six buildings, with a first phase of two 100 MW data centres costing about 7 billion euros (7.8 billion dollars) including construction and computing hardware. Electricity would come from nearby offshore wind farms through Eneco. Baxtel describes the project as a planned EU AI gigafactory, but the EuroHPC AI Factories page fetched for this sweep lists no selected AI Gigafactory sites, so that label is unconfirmed. No GPU type or count, construction start or energisation date is given, and a letter of intent is not a lease. Nebius's other European sites include nebius-bethune and nebius-lappeenranta.
Timeline
- 2026-10-13 Announced source
Site & facility
Volt Rotterdam Campus Site
- Location
- Rotterdam, Netherlands
- Utility
- Eneco (offshore wind supply)
Change history
- 2026-10-17 Added Nebius Rotterdam (Volt) (Nebius)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| baxtel.com | names system only | - |