COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/Nebius Rotterdam (Volt)

Netherlands · planned · ai training

Nebius Rotterdam (Volt)

Also known as Volt Rotterdam AI campus

Operated by Nebius at Volt Rotterdam Campus Site .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Nebius first offtaker under a letter of intent for 600 MW in six buildings
Nebius - Reported baxtel.com
Integrator -
Volt develops the Rotterdam campus, first phase two 100 MW data centres
Volt
- Reported baxtel.com
Power -
Eneco supplies offshore wind electricity to the campus
Eneco
- Reported baxtel.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Stated investment 7.8 USD bn 2026-10 Operator stated First phase about 7 billion euros including construction and computing hardware; a letter of intent, not a final budget baxtel.com

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Wind and solar Eneco - planned 2026-10 Operator stated Electricity from nearby offshore wind farms supplied by Eneco; MW not stated baxtel.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

Nebius signed a letter of intent in October 2026 to be first offtaker of Volt's planned Rotterdam campus: 600 MW across six buildings, with a first phase of two 100 MW data centres costing about 7 billion euros (7.8 billion dollars) including construction and computing hardware. Electricity would come from nearby offshore wind farms through Eneco. Baxtel describes the project as a planned EU AI gigafactory, but the EuroHPC AI Factories page fetched for this sweep lists no selected AI Gigafactory sites, so that label is unconfirmed. No GPU type or count, construction start or energisation date is given, and a letter of intent is not a lease. Nebius's other European sites include nebius-bethune and nebius-lappeenranta.

Timeline

Site & facility

Volt Rotterdam Campus Site

Location
Rotterdam, Netherlands
Utility
Eneco (offshore wind supply)

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
baxtel.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading