COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/RIKYU

Japan · operational · ai training

RIKYU

Also known as RIKEN AI for Science supercomputer

Operated by RIKEN at RIKEN Center for Computational Science .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
operator stated
Rpeak
64.16 PFlop/s
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator -
NVIDIA GB200 NVL4 Blackwell GPUs, 1,600 across 400 compute nodes
NVIDIA 1,600
verified
Verified docs.r-ccs.riken.jpinvestor.nvidia.com
Interconnect NVIDIA InfiniBand XDR (Quantum-X800)
Interconnect
Fat tree or dragonfly+ · 800 Gb/s per port
NVIDIA Quantum-X800 InfiniBand up to 3.2 Tb/s
NVIDIA - Verified docs.r-ccs.riken.jpinvestor.nvidia.com

Engineering, funding and access

What RIKYU runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes400 nodesEach node is an NVIDIA GB200 NVL4 with 2 Grace CPUs and 4 B200 GPUs, 960 GiB LPDDR5X and 692.8 GiB HBM3e; system totals are 375 TiB CPU memory and 270.625 TiB GPU memory.2026Operator stateddocs.r-ccs.riken.jp
Storage capacity11 PB1 PB high-speed SSD plus 10 PB large-capacity HDD shared storage, plus one 7.68 TB Kioxia XD7P NVMe SSD per node. The filesystem is not named on the page.2026Operator stateddocs.r-ccs.riken.jp
Interconnect and topologyNVIDIA Quantum-X800 InfiniBand XDR, 4 x 800 Gb/s per node, two-layer fat tree of 6 spine and 17 leaf switchesNVIDIA's November 2025 release also names Quantum-X800 InfiniBand; the fat-tree detail is from RIKEN only.2026Operator stateddocs.r-ccs.riken.jpinvestor.nvidia.com

Software

ItemDetailAs ofBasisSource
Programming and software stackEnvironment modules, containers, Spack, Open OnDemand, Open Composer and a generative AI service (listed as user-guide sections)The documentation index lists these sections without detail.2026Operator stateddocs.r-ccs.riken.jp

Access

ItemDetailAs ofBasisSource
How researchers get timeRIKYU Account Application System (RAAS) for ARiSE users, accepted SPReAD1000 projects and RIKEN members; 300 yen per GPU hour plus tax, billed in arrears2026Operator stateddocs.r-ccs.riken.jp
Access pagedocs.r-ccs.riken.jp/rikyu/en2026Operator stateddocs.r-ccs.riken.jp

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 1,600 accelerators 2026-10 Operator stated 400 GB200 NVL4 nodes; RIKEN documentation and NVIDIA's November 2025 release agree on 1,600 Blackwell GPUs. docs.r-ccs.riken.jpinvestor.nvidia.com

The read

RIKEN's AI for Science supercomputer at the Kobe campus: 400 compute nodes of NVIDIA GB200 NVL4 (1,600 Blackwell GPUs) on Quantum-X800 InfiniBand at up to 3.2 Tb/s, rated by RIKEN at over 64.16 PFLOPS in FP64 and over 15.539 EFLOPS in FP8. NVIDIA's November 2025 release independently gives the 1,600-GPU count. RIKEN's user documentation shows it in Early Access Phase 2, with production operation scheduled to start on 14 October 2026, so full production had not started at the check date. It and ROQUO are proxy machines for the FugakuNEXT design. The FP64 figure is a stated rating, not an HPL run.

Timeline

  • 2025-11-17 Announced source
  • 2026-10-14 RIKYU production operation starts after Early Access Phase 2, with usage from October 2026 billed in January 2027. source

Site & facility

RIKEN Center for Computational Science

Location
Kobe, Japan
Cooling
Direct liquid cooling (warm water)
Commissioned
2010

Change history

Nearby in scale

The machines closest to RIKYU by accelerator count, smaller to larger.

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
docs.r-ccs.riken.jpnames system only-
investor.nvidia.comcould not be fetched-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.