Supercomputers/Systems/Levente
Hungary · planned · mixed
Levente
Also known as Hungarian EuroHPC mid-range supercomputer
Operated by DKF .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Cooling | - energy-efficient liquid cooling planned | DKF | - | Reported | eurohpc-ju.europa.eu |
Engineering, funding and access
What Levente runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | EuroHPC Joint Undertaking, up to EUR 14.8 million or 35 percent of the EUR 42 million cost | 2025-07 | Operator stated | eurohpc-ju.europa.eu |
| Funded by | Hungary, which provides 65 percent of the cost from national funds | 2025-07 | Operator stated | eurohpc-ju.europa.eu |
| Procurement | DKF manages the procurement with the EuroHPC JU; in July 2025 it was due to begin in the immediate futureThe cited page dates from July 2025; no later procurement notice was fetched | 2025-07 | Operator stated | eurohpc-ju.europa.eu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Computing time will be managed jointly by Hungary and the EuroHPC JU in proportion to their investments | 2025-07 | Operator stated | eurohpc-ju.europa.eu |
The read
Hungary's planned EuroHPC mid-range supercomputer in Budapest, operated by DKF (the Digital Government Development and Project Management Company). EuroHPC states a performance of at least 23 petaflops, enhanced AI capabilities in support of the AI Factories strategy, liquid cooling and a EUR 42 million cost with EuroHPC contributing up to EUR 14.8 million. The hosting agreement was signed on 9 July 2025 and procurement had yet to begin; no supplier, hardware or start date is published. The 23 petaflop figure is a floor, so no FLOPS value is entered.
Timeline
- 2025-07-09 Announced source
Change history
- 2026-10-07 Added Levente (DKF, Budapest)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| eurohpc-ju.europa.eu | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.