Supercomputers/Systems/ASCI Blue Mountain

USA · decommissioned · classified

ASCI Blue Mountain

Operated by Los Alamos National Laboratory at Los Alamos Strategic Computing Complex .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.61 TFlop/s
HPL measured
Rpeak
3.07 TFlop/s
Rmax ÷ Rpeak
52.3%
Cores
6,144
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of ASCI Blue Mountain, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.61 TFlop/s#3 of 33 · top 6%#312 of 332 · bottom 7%
Rmax ÷ Rpeak52.3 %#31 of 33 · bottom 7%#306 of 331 · bottom 9%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
SGI Origin 2000 cluster
SGI - Verified top500.orgenergy.gov
CPU SGI Origin 2000 (MIPS R10000)
CPUs
MIPS IV · 1C · 0.25 GHz · 350 nm
MIPS R10000 250MHz, 48 Origin 2000 nodes of 128 CPUs each
SGI 6,144
reported
Reported top500.org
Interconnect HIPPI
Interconnect
800 Mbit/s per HIPPI-800 link
HIPPI
SGI - Reported top500.org
Operating system IRIX
Operating systems
IRIX
SGI - Reported top500.org

Engineering, funding and access

What ASCI Blue Mountain runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyHIPPITOP500 list entry1999-06Operator statedtop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackIRIX operating systemTOP500 list entry1999-06Operator statedtop500.org

The read

LANL's cluster of 48 SGI Origin 2000 nodes joined by HIPPI, installed in November 1998 and second on the June 1999 TOP500 at 1.608 TFlop/s Rmax, the first ASCI Blue-series machine to follow ASCI Red. NNSA's own retrospective independently names SGI as builder and gives roughly 3 TFlop/s peak, consistent with TOP500's 3.072 TFlop/s Rpeak, and credits the machine with simulations for the W88 pit-rebuild programme. Sources outside TOP500 and NNSA place its retirement around November 2004, but that date traces back to Wikipedia alone among what we could fetch, so no decommissioned_date is recorded. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.

Timeline

  • 1998-11 First operational source
  • 1999-06 Listed at #2 on the TOP500 (June 1999) source
  • 1999-06 Its TOP500 Linpack result rose from 690.9 GFlop/s in November 1998 to 1,608 GFlop/s in June 1999 source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Los Alamos Strategic Computing Complex

Location
Los Alamos, NM, USA
Cooling
Chilled water
Commissioned
1993

Change history

Nearby in scale

The machines closest to ASCI Blue Mountain by Rmax, smaller to larger.

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
energy.govnames system only-
top500.orgnames system, part and countHIPPI, IRIX · counts: 6144

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.