Supercomputers/Systems/JUWELS Cluster
Germany · operational · hpc
JUWELS Cluster
Operated by Forschungszentrum Julich at Julich Supercomputing Centre .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 6.18 PFlop/s
- Rpeak
- 9.89 PFlop/s
- Rmax ÷ Rpeak
- 62.5%
- Cores
- 114,480
- Power
- 1.36 MW
- Per watt
- 4.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Atos BullSequana X1000 | Eviden | - | Reported | fz-juelich.detop500.org |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W 56 accelerated nodes with four NVIDIA V100 16GB | NVIDIA | 224 estimated | Reported | apps.fz-juelich.de |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds InfiniBand EDR fat tree with HDR top-level switches | NVIDIA | - | Reported | apps.fz-juelich.de |
The read
Julich's Eviden BullSequana X1000 general-purpose module, which TOP500 lists as JUWELS Module 1, 23rd on the June 2018 TOP500. JSC counts 122,768 cores against TOP500's 114,480 and quotes a larger peak that includes later additions, so TOP500's figures are used and the conflict is logged. JSC's system page and its journal paper are the same organization, so they do not corroborate each other. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Julich Supercomputing Centre
- Location
- Julich, Germany
- Cooling
- Direct liquid cooling
- Commissioned
- 2004
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Core count: 122,768 (JSC) against 114,480 (TOP500). JSC includes later additions; TOP500 is used.
Change history
- 2026-09-22 Gained a Green500 rank pointer (#171 on the 2025-06 list)
- 2026-09-20 Added with a rank pointer on the edition where it ranked highest
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| fz-juelich.de | names system and part | Mellanox InfiniBand EDR |
| top500.org | names system and part | Mellanox InfiniBand EDR |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.