Supercomputers/Systems/KAIROS
France · operational · mixed
KAIROS
Operated by CALMIP at CALMIP Mesocentre .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.05 PFlop/s
- Rpeak
- 3.42 PFlop/s
- Rmax ÷ Rpeak
- 89.2%
- Cores
- 13,056
- Power
- 46.18 kW
- Per watt
- 66.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of KAIROS, and those in France. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.05 PFlop/s | #186 of 202 · bottom 9% | #19 of 52 · top 35% |
| Energy efficiency | 66.0 GF/W | #5 of 99 · top 4% | #2 of 42 · top 2% |
| Rmax ÷ Rpeak | 89.2 % | #21 of 199 · top 10% | #5 of 51 · top 8% |
| Power draw | 46 kW | #101 of 104 · bottom 4% | #41 of 42 · bottom 3% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - BullSequana XH3000 | Eviden | - | Reported | top500.orgcalmip.univ-toulouse.fr |
| Accelerator | NVIDIA GH200 Grace Hopper Superchip Accelerators Arm CPU + CUDA GPU · TSMC 4N NVIDIA GH200 Superchip, 64 GPUs in the accelerated partition | NVIDIA | 64 reported | Reported | calmip.univ-toulouse.frtop500.org |
| CPU | NVIDIA Grace CPUs Armv9 (Neoverse V2) · 72C · 3.1 GHz · TSMC 4N GH Superchip 72C 3GHz | NVIDIA | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Quad-Rail NVIDIA InfiniBand NDR200 | NVIDIA | - | Reported | top500.orgcalmip.univ-toulouse.fr |
| Operating system | - Red Hat Enterprise Linux | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What KAIROS runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 120 nodesFull system per CALMIP: 120 compute nodes, 24,576 cores and 64 GPUs; TOP500 lists only the 13,056-core GPU partition. | 2026-01 | Operator stated | calmip.univ-toulouse.fr |
| Interconnect and topology | InfiniBand NDR (quad-rail NDR200 on the GPU partition run)CALMIP quotes InfiniBand NDR; TOP500 lists quad-rail NVIDIA InfiniBand NDR200. | 2026-01 | Operator stated | calmip.univ-toulouse.frtop500.org |
| Cooling design | Direct warm-water cooling | 2026-01 | Operator stated | calmip.univ-toulouse.fr |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Red Hat Enterprise Linux, NVIDIA HPC-Benchmarks, cuBLAS and HPC-X MPI (as submitted for the TOP500 HPL run) | 2025-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Eviden BullSequana XH3000 with 5 years of maintenance and 100 days of accompaniment; installation autumn 2025 to spring 2026 | 2026-01 | Operator stated | calmip.univ-toulouse.fr |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | CALMIP resources are open to projects validated by its Comite de Programmes; 2026 compute resources move from Olympe to KAIROS | 2026-01 | Operator stated | calmip.univ-toulouse.fr |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2025: first on the November 2025 Green500 list, presented at SC25; TOP500 lists 3.05 PFlop/s Rmax at 46.18 kWCALMIP page cites 186 kW under HPL for the full system; TOP500 power is for the GPU partition run. | 2025-11 | Operator stated | calmip.univ-toulouse.frtop500.org |
The read
CALMIP's BullSequana XH3000 mesocentre system in Toulouse, which took first place on the November 2025 Green500 at 73.28 GFlops/Watt on only 46 kW for its 3.05 PFlop/s HPL run, ahead of ROMEO-2025 and the Levante GPU extension. TOP500 lists the GH200 accelerated partition (13,056 cores) at 3.05 PFlop/s Rmax and 3.42 PFlop/s Rpeak; CALMIP's own page describes the full system as 120 compute nodes with 24,576 cores, 64 GPUs and 4.77 PFlop/s peak, and states its own HPL figure for the GPU partition as 3.03 PFlop/s, so the two sources differ slightly on Rmax and the TOP500 value is used here. CALMIP planned installation from autumn 2025 and production in summer 2026 as the successor to Olympe, and a July 2026 University of Toulouse article still describes production as upcoming, so no first_operational_date is recorded.
Timeline
- 2025 Announced source
- 2025-11 Listed at #1 on the Green500 (November 2025) source
- 2025-11 Ranked first on the November 2025 Green500 list source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
CALMIP Mesocentre
- Location
- Toulouse, France
- Cooling
- Hot water core cooling
- Commissioned
- 2025
Change history
- 2026-10-02 Added KAIROS, CALMIP's GH200 system, No. 1 on the November 2025 Green500
Nearby in scale
The machines closest to KAIROS by Rmax, smaller to larger.
- Palmetto2 (Clemson) · USA, operational · 3.01 PFlop/s
- DKRZ Mistral · Germany, operational · 3.01 PFlop/s
- ARF CPU Cluster · Turkey, operational · 3 PFlop/s
- Barnard · Germany, operational · 3.05 PFlop/s
- Circe · USA, operational · 3.06 PFlop/s
- Camphor 2 · Japan, operational · 3.06 PFlop/s
Related systems
Same accelerator
- DAEDALUS · Greece, under construction
- Discovery 6 · USA, operational, 2025
- Isambard-AI Phase 2 · United Kingdom, operational, 2025
- JUPITER · Germany, operational, 2025
- KISTI-6 · South Korea, under construction
- Levante GPU Extension · Germany, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA GH200 Grace Hopper Superchip, NVIDIA InfiniBand NDR (Quantum-2) |
| calmip.univ-toulouse.fr | names system, part and count | NVIDIA InfiniBand NDR (Quantum-2) · counts: 64 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.