Supercomputers/Systems/CMCC Cassandra
Italy · operational · hpc
CMCC Cassandra
Also known as Cassandra
Operated by CMCC at CMCC Supercomputing Center (Lecce) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- 1.23 PFlop/s
- Rmax ÷ Rpeak
- -
- Cores
- 20,160
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Lenovo ThinkSystem SD650 V3 nodes (180) | Lenovo | 180 reported | Reported | cmcc.itnews.lenovo.com |
| CPU | - Two Intel Xeon Max 9480 (Sapphire Rapids, HBM) per node, 20,160 cores in total | Intel | - | Reported | cmcc.itnews.lenovo.com |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds InfiniBand NDR 400 Gbps | NVIDIA | - | Reported | cmcc.it |
| Cooling | - Lenovo Neptune direct water cooling | Lenovo | - | Reported | news.lenovo.comcmcc.it |
Engineering, funding and access
What CMCC Cassandra runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 180 nodesLenovo ThinkSystem SD650 V3 nodes | 2026-10 | Operator stated | cmcc.itnews.lenovo.com |
| Total memory | 184.32 TBOur arithmetic: 180 nodes x 1,024 GB | 2026-10 | Operator stated | cmcc.it |
| Storage capacity | 13.7 PBOur sum: 13.6 PB /work + 0.1 PB /users_home | 2026-10 | Operator stated | cmcc.it |
| Cooling design | Lenovo Neptune direct water cooling, which Lenovo says captures up to 98 percent of the heat and uses 15 percent less cooling electricity than comparable air-cooled systemsCMCC lists the nodes as direct water cooled | 2024-05 | Vendor stated | news.lenovo.comcmcc.it |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | IBM Spectrum Scale 5 (GPFS): 13.6 PB usable /work and 100 TB /users_homeLong-term data goes to the centre's Deep Archive tape system, given as 62 PB on the same page | 2026-10 | Operator stated | cmcc.it |
| Job scheduler | IBM Spectrum LSF 10 | 2026-10 | Operator stated | cmcc.it |
| Programming and software stack | Red Hat Enterprise Linux 9.0 | 2026-10 | Operator stated | cmcc.it |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Lenovo announced the order on 9 May 2024, with installation by Lenovo partner Ricca IT during 2024 and two extra nodes of eight NVIDIA H100 GPUs each planned for the second half of 2024 | 2024-05 | Vendor stated | news.lenovo.com |
The read
CMCC's newer climate HPC system in Lecce: 180 Lenovo ThinkSystem SD650 V3 direct-water-cooled nodes (Lenovo Neptune) each with two Intel Xeon Max 9480 (Sapphire Rapids with HBM, 56 cores) CPUs, 20,160 cores, 1 TB per node, InfiniBand NDR 400 Gbps, 1,225 TFlop/s peak and 13.6 PB of storage on Red Hat 9. Lenovo announced the order on 9 May 2024 as a 1.2 PFlop/s system that doubles the centre's earlier capacity, with two extra nodes of eight NVIDIA H100 GPUs each planned for AI work and installation by partner Ricca IT scheduled for 2024. The exact go-live date is not stated in the sources, so the first-operational year is recorded as 2024 and the status date is the 2026-10 listing. No TOP500 entry was found.
Site & facility
Change history
- 2026-10-02 Added CMCC Cassandra
Related systems
Same site
- CMCC Juno · Italy, operational, 2022
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| news.lenovo.com | names system only | - |
| cmcc.it | names system and part | NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.