COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/CMCC Cassandra

Italy · operational · hpc

CMCC Cassandra

Also known as Cassandra

Operated by CMCC at CMCC Supercomputing Center (Lecce) .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
operator stated
Rpeak
1.23 PFlop/s
Rmax ÷ Rpeak
-
Cores
20,160
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo ThinkSystem SD650 V3 nodes (180)
Lenovo 180
reported
Reported cmcc.itnews.lenovo.com
CPU -
Two Intel Xeon Max 9480 (Sapphire Rapids, HBM) per node, 20,160 cores in total
Intel - Reported cmcc.itnews.lenovo.com
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
InfiniBand NDR 400 Gbps
NVIDIA - Reported cmcc.it
Cooling -
Lenovo Neptune direct water cooling
Lenovo - Reported news.lenovo.comcmcc.it

The read

CMCC's newer climate HPC system in Lecce: 180 Lenovo ThinkSystem SD650 V3 direct-water-cooled nodes (Lenovo Neptune) each with two Intel Xeon Max 9480 (Sapphire Rapids with HBM, 56 cores) CPUs, 20,160 cores, 1 TB per node, InfiniBand NDR 400 Gbps, 1,225 TFlop/s peak and 13.6 PB of storage on Red Hat 9. Lenovo announced the order on 9 May 2024 as a 1.2 PFlop/s system that doubles the centre's earlier capacity, with two extra nodes of eight NVIDIA H100 GPUs each planned for AI work and installation by partner Ricca IT scheduled for 2024. The exact go-live date is not stated in the sources, so the first-operational year is recorded as 2024 and the status date is the 2026-10 listing. No TOP500 entry was found.

Timeline

Site & facility

CMCC Supercomputing Center (Lecce)

Location
Lecce, Italy
Commissioned
2022

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
news.lenovo.comnames system only-
cmcc.itnames system and partNVIDIA InfiniBand NDR (Quantum-2)

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading