Supercomputers/Systems/Expanse
USA · operational · hpc
Expanse
Operated by SDSC at San Diego Supercomputer Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 2.48 PFlop/s
- Rpeak
- 3.30 PFlop/s
- Rmax ÷ Rpeak
- 75.2%
- Cores
- 91,648
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Expanse, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 2.48 PFlop/s | #151 of 213 · bottom 30% | #132 of 332 · top 40% |
| Rmax ÷ Rpeak | 75.2 % | #57 of 209 · top 27% | #162 of 331 · top 49% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell | Dell Technologies | - | Verified | sdsc.eduprnewswire.com |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W 52 GPU nodes with four NVIDIA V100 SXM2 | NVIDIA | 208 reported | Reported | sdsc.edu |
| CPU | AMD EPYC 7742 (Rome) CPUs x86-64 · 64C · 2.25 GHz · 7 nm · 225 W AMD EPYC 7742 Rome, 728 standard nodes | AMD | - | Reported | sdsc.edutop500.org |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds HDR InfiniBand hybrid fat tree | NVIDIA | - | Verified | sdsc.edutop500.org |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid direct liquid cooling on the compute nodes | Dell Technologies | - | Reported | sdsc.edu |
Engineering, funding and access
What Expanse runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 784 nodesDerived: 728 standard AMD EPYC 7742 nodes + 52 GPU nodes with four V100 each + 4 large-memory nodes of 2 TB; 13 scalable compute units of 56 standard and 4 GPU nodes. | 2026-11 | Operator stated | sdsc.edu |
| Total memory | 220 TBTotal DRAM; there is also 810 TB of node NVMe. | 2026-11 | Operator stated | sdsc.edu |
| Storage capacity | 19 PBDerived: 12 PB Lustre plus 7 PB Ceph object storage. | 2026-11 | Operator stated | sdsc.eduapi.nsf.gov |
| Interconnect and topology | HDR InfiniBand in a hybrid fat tree, 100 Gb/s linksThe NSF award abstract names Mellanox InfiniBand. | 2026-11 | Operator stated | sdsc.eduapi.nsf.gov |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre 12 PB (scratch and projects) and Ceph 7 PB object storage, plus 1 to 3.2 TB of node-local NVMe per node | 2026-11 | Operator stated | sdsc.edusdsc.edu |
| Job scheduler | Slurm | 2026-11 | Operator stated | sdsc.edu |
| Programming and software stack | Rocky Linux with the Lmod module system; AOCC, GCC, Intel and PGI compilers | 2026-11 | Operator stated | sdsc.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | National Science Foundation, Office of Advanced Cyberinfrastructure, award 1928224 | 2019-10-01 | Operator stated | api.nsf.gov |
| Funding programme | NSF Category I award: Computing without Boundaries: Cyberinfrastructure for the Long Tail of Science | 2019-10-01 | Operator stated | api.nsf.gov |
| Stated cost | 10 USD mEstimated total of NSF award 1928224; the record also shows $37.76 million obligated across FY2019 to FY2026, which exceeds that estimate. | 2019-10-01 | Operator stated | api.nsf.gov |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Proposals through the NSF ACCESS Allocation Request System or trial accounts on request, plus HPC@MSI rapid-access allocations for Minority Serving Institutions | 2026-11 | Operator stated | sdsc.eduapi.nsf.gov |
| Access page | allocations.access-ci.org | 2026-11 | Operator stated | sdsc.edu |
The read
SDSC's NSF-funded Dell system of 728 AMD EPYC 7742 nodes and 52 four-V100 nodes on HDR InfiniBand, in service from December 2020 and 153rd on the November 2020 TOP500, since slipped to 492nd. SDSC and Dell independently name Dell and the NSF record confirms the award, so those facts are verified. SDSC's guide says Rocky Linux where TOP500 says CentOS, so no OS edge is recorded. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Operating system: Rocky Linux (SDSC guide) against CentOS (TOP500). TOP500 may be stale; no OS edge is recorded.
Change history
- 2026-09-20 Added, funding verified against the NSF award record
Nearby in scale
The machines closest to Expanse by Rmax, smaller to larger.
- Lomonosov-2 · Russia, operational · 2.48 PFlop/s
- Centennial (ARL) · USA, operational · 2.44 PFlop/s
- CMA PAI-A · China, operational · 2.44 PFlop/s
- CLAIX-2018 · Germany, decommissioned · 2.48 PFlop/s
- Kay (ARL) · USA, operational · 2.48 PFlop/s
- Excalibur · USA, operational · 2.49 PFlop/s
Related systems
Same site
- Voyager · USA, operational, 2022
- Comet · USA, decommissioned, 2015
- Cosmos (SDSC) · USA, operational, 2025
- Expanse2 · USA, planned
- Gordon · USA, decommissioned, 2012
- Trestles (SDSC) · USA, decommissioned, 2010
Same operator
- DataStar · USA, decommissioned, 2004
- Intimidata · USA, operational, 2004
- Blue Horizon · USA, decommissioned, 2000
Same accelerator
- Atlas (Petrobras) · Brazil, operational, 2020
- Dammam-7 · Saudi Arabia, operational, 2020
- Flow Type II · Japan, decommissioned, 2020
- Gadi · Australia, operational, 2020
- Garrawarla · Australia, operational, 2020
- HPC5 · Italy, operational, 2020
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| api.nsf.gov | names system and part | NVIDIA InfiniBand HDR, Direct liquid cooling, warm water |
| top500.org | names system and part | AMD EPYC 7742 (Rome), NVIDIA InfiniBand HDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.