Supercomputers/Systems/ORNL Paragon XP/S 35
USA · operational · hpc
ORNL Paragon XP/S 35
Also known as Intel XP/S 35; XP/S35
Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 15.2 GFlop/s
- Rpeak
- 26.0 GFlop/s
- Rmax ÷ Rpeak
- 58.5%
- Cores
- 512
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Intel Paragon XP/S 35 | Intel | - | Reported | top500.org |
| CPU | Intel i860/XP CPUs i860 RISC · 1C · 0.05 GHz · 1000 nm Intel i860 XP 50 MHz, 512 processors | Intel | 512 reported | Reported | top500.org |
| Interconnect | Intel Paragon 2D mesh Interconnect 2D mesh with torus wraparound · 200 MB/s per link Paragon 2-D mesh (torus) | Intel | - | Reported | top500.org |
The read
TOP500 lists an Intel XP/S 35 at Oak Ridge National Laboratory installed in 1992 with 512 Intel i860 50 MHz processors on a 2-D mesh running OSF/1, 15.2 GFLOPS Rmax and 26.0 GFLOPS peak, eighth on the November 1993 list, and it stayed on the list until June 1998. It predates and is distinct from ORNL's XP/S 150, which is recorded separately. TOP500 is the only source fetched, so the tier is reported. The June 1998 list is the last evidence of operation and is recorded as the status date.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Oak Ridge Leadership Computing Facility
- Location
- Oak Ridge, TN, USA
- Utility
- Tennessee Valley Authority
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1993
Change history
- 2026-10-09 Added ORNL Paragon XP/S 35
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
Every source cited on this page was readable, and none of them mentions this system. They are cited at page granularity, normally because no stable deep link could be found. That is a real weakness in this row and it is why the system carries a confidence tier below verified. See how this check works.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | does not name this system | · counts: 512 |
Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.