Saudi Arabia
DataVolt
Saudi digital infrastructure developer building a 360 MW first phase of a planned 1.5 GW AI data center campus at Oxagon, NEOM, with HUMAIN taking 100 MW.
Systems this company appears in
- Systems
- 1
- Aggregate Rmax
- 0.0 GFlop/s
- Aggregate power
- 0 kW
- First appearance
- 2026-08
- Most recent
- 2026-08
- Concentration
- -
Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.
Role breakdown
| Role | Systems | Rmax in those systems |
|---|---|---|
| Integrator | 1 | 0.0 GFlop/s |
Appearances
| System | Supplied as | Shipped under | Rmax | Rank |
|---|---|---|---|---|
| DataVolt Oxagon AI Campus Saudi Arabia · | Integrator | DataVolt | - | unranked |
AI datacenters operated
| System | Status | Accelerators | Stated power (MW) |
|---|---|---|---|
| DataVolt Oxagon AI Campus | under construction | - | 360 |
Figures come from the AI datacenter metrics; blank means none recorded.
Compute deals
| Date | Role | Counterparty | Type | MW | Value ($bn) | Source |
|---|---|---|---|---|---|---|
| 2025-05 | Buyer | Supermicro | Chip supply | - | 20 | baxtel.com |
Headline values are as announced and are not additive. See all compute deals.
Sites operated
| Site | Location | Cooling | Commissioned |
|---|---|---|---|
| Oxagon Data Centre Site (NEOM) | Oxagon, NEOM, Saudi Arabia | - | - |