Saudi digital infrastructure developer building a 360 MW first phase of a planned 1.5 GW AI data center campus at Oxagon, NEOM, with HUMAIN taking 100 MW.

Systems this company appears in

Systems
1
Aggregate Rmax
0.0 GFlop/s
systems it appears in
Aggregate power
0 kW
where disclosed
First appearance
2026-08
Most recent
2026-08
Concentration
-
largest is DataVolt Oxagon AI Campus

Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.

Role breakdown

Role Systems Rmax in those systems
Integrator 1 0.0 GFlop/s

Appearances

System Supplied as Shipped under Rmax Rank
DataVolt Oxagon AI Campus
Saudi Arabia ·
Integrator DataVolt - unranked

AI datacenters operated

SystemStatusAcceleratorsStated power (MW)
DataVolt Oxagon AI Campus under construction - 360

Figures come from the AI datacenter metrics; blank means none recorded.

Compute deals

DateRoleCounterpartyTypeMWValue ($bn)Source
2025-05 Buyer Supermicro Chip supply - 20 baxtel.com

Headline values are as announced and are not additive. See all compute deals.

Sites operated

Site Location Cooling Commissioned
Oxagon Data Centre Site (NEOM) Oxagon, NEOM, Saudi Arabia - -