COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Quartz (LLNL)

USA · decommissioned · hpc

Quartz (LLNL)

Also known as LLNL CTS-1 Quartz

Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
2.63 PFlop/s
HPL measured
Rpeak
3.21 PFlop/s
Rmax ÷ Rpeak
81.9%
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Penguin Computing Tundra Extreme Scale (CTS-1)
Penguin Computing
- Reported top500.orghpc.llnl.gov
CPU Intel Xeon E5-2695 v4
CPUs
x86-64 · 18C · 2.1 GHz · 14 nm · 120 W
Two 18-core Intel Xeon E5-2695 v4 2.1 GHz per node
Intel - Reported hpc.llnl.gov
Interconnect Omni-Path Architecture
Interconnect
Fat tree · 100 Gb/s per port · About 1 microsecond
Omni-Path interconnect
Cornelis Networks
- Reported hpc.llnl.gov

The read

Livermore Computing's Quartz, a Penguin Computing Tundra Extreme Scale system of the CTS-1 commodity procurement: nodes of two 18-core Xeon E5-2695 v4 CPUs on Omni-Path, commissioned in 2016 according to LLNL's hardware page, which now marks it decommissioned without a date. TOP500 lists it from 43rd in November 2016 to 71st in November 2018 at 2.63 petaflops Rmax and 3.21 petaflops Rpeak. LLNL counts 3,018 nodes and 108,648 cores while TOP500 counts 95,472 cores, and TOP500's 13,620 kW power figure looks like a facility-level value, so neither cores nor power are recorded. TOP500 is the only source for Rmax and Rpeak, so the tier is reported.

Timeline

  • 2016 First operational source
  • 2016-11 List debut at #43 (November 2016) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Livermore Computing Center

Location
Livermore, CA, USA
Cooling
Direct liquid cooling (warm water)
Commissioned
1996

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
hpc.llnl.govnames system and partIntel Xeon E5-2695 v4, Omni-Path Architecture
top500.orgnames system and partIntel Xeon E5-2695 v4, Omni-Path Architecture

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading