Supercomputers/Systems/Racks Central RCJM AI Campus
Malaysia · under construction · ai training
Racks Central RCJM AI Campus
Also known as Racks Central Johor AI factory campus; RCJM1
Operated by Racks Central at Iskandar Halal Park (Racks Central) .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Racks Central develops the 510 MW campus of four AI factory facilities; RCJM1 first | Racks Central | - | Reported | rackscentral.comw.media |
| Accelerator | - NVIDIA Blackwell GPUs in phase 1, then Vera Rubin and Rubin Ultra in later phases (counts not stated) | NVIDIA | - | Reported | w.media |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Stated investment | 6.73 USD bn | 2026-06 | Design target | W.Media reports the project investment as 26.6 billion ringgit, about 6.73 billion dollars. | w.media |
| Facility power | 510 MW | 2026-06 | Design target | Total planned campus capacity across four facilities; the announcement does not say whether this is IT or facility load. | rackscentral.comw.media |
The read
Racks Central's 510 MW AI factory campus at Iskandar Halal Park in Pasir Gudang, Johor, billed as the first in Southeast Asia and made up of four facilities (RCJM1, RCJM2A, RCJM2B and RCJM3, with 2A and 2B together 300 MW). Racks Central's 30 June 2026 milestone release gives a 70 MW first phase (RCJM1) with early access in December 2026 and ready for service in Q1 2027; W.Media adds that the campus will deploy NVIDIA Blackwell, then Vera Rubin, then Rubin Ultra in successive phases, on a 26.6 billion ringgit (6.73 billion dollar) investment. A second W.Media article gives RCJM1 as 90 MW, so the first-phase figure conflicts and the tier is reported. No GPU count is published.
Timeline
- 2026-06 Announced source
Site & facility
Change history
- 2026-10-04 Added Racks Central RCJM AI Campus (Racks Central)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| w.media | names system only | - |
| rackscentral.com | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.