Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.00 PFlop/s
- Rpeak
- 1.55 PFlop/s
- Rmax ÷ Rpeak
- 64.5%
- Cores
- 20,160
- Power
- 219.5 kW
- Per watt
- 4.6 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Lemhi, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.00 PFlop/s | #178 of 223 · bottom 21% | #183 of 332 · bottom 46% |
| Energy efficiency | 4.6 GF/W | #56 of 133 · top 42% | #47 of 162 · top 29% |
| Rmax ÷ Rpeak | 64.5 % | #140 of 216 · bottom 36% | #250 of 331 · bottom 26% |
| Power draw | 220 kW | #109 of 137 · bottom 22% | #125 of 171 · bottom 28% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge C6420, 504 nodes | Dell Technologies | - | Reported | top500.orgdocs.c3plus3.org |
| CPU | Intel Xeon Gold 6148 CPUs x86-64 · 20C · 2.4 GHz · 14 nm · 150 W Intel Xeon Gold 6148 20C 2.4GHz, two per node | Intel | - | Reported | top500.orgdocs.c3plus3.org |
| Interconnect | Omni-Path Architecture Interconnect Fat tree · 100 Gb/s per port · About 1 microsecond Intel Omni-Path | Cornelis Networks | - | Reported | top500.orgdocs.c3plus3.org |
| Operating system | CentOS Operating systems Linux distribution, RHEL-compatible rebuild · Open source, community-maintained CentOS | The CentOS Project | - | Reported | top500.org |
Engineering, funding and access
What Lemhi runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 504 nodesIdaho State University facilities statement for the C3+3 partnership (undated, fetched 2026-11): each node has two 20-core Xeon Gold 6148 and 192 GB; it also lists five GPU nodes with 26 GPUs (RTX A6000, Quadro RTX 8000, L40, RTX 4500 Ada) that are not in the 504 | 2026 | Operator stated | isu.edu |
| Total memory | 94.5 TBStated as 94.5 terabytes, which matches 504 nodes x 192 GB = 96,768 GB counted in binary units (96,768 / 1,024 = 94.5) | 2026 | Operator stated | isu.edu |
| Storage capacity | 1.2 PBCeph storage cluster connected to Lemhi, as described after the hand-over to the C3+3 universities; INL-era storage is not stated | 2026 | Operator stated | isu.edu |
| Interconnect and topology | Intel Omni-PathTOP500 list entry | 2018-11 | Operator stated | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Ceph storage cluster of 1.2 PB connected to the cluster | 2026 | Operator stated | isu.edu |
| Programming and software stack | Intel compilers, Intel MKL and Intel MPI for the HPL run, on CentOSTOP500 list entry | 2018-11 | Operator stated | top500.org |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Since INL opened it to academic research, researchers at Boise State, the University of Idaho and Idaho State University log in remotely with their university credentials under the C3+3 partnershipHosted at INL's Collaborative Computing Center in Idaho Falls; the University of Idaho runs day-to-day operations and leadership rotates, with Boise State expected to lead from late 2026. INL researchers used Lemhi for about six years before this. Both pages carry the same joint announcement | 2026-02 | Operator stated | boisestate.eduuidaho.edu |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2026: Idaho State University's GIS Training and Research Center ran digital terrain and ladder-fuel models for FEMA- and NASA-funded wildfire mitigation and post-fire studies; one task that took 12.8 hours on a workstation finished in six minutesReported by Keith Weber of Idaho State University | 2026-02 | Operator stated | boisestate.eduuidaho.edu |
The read
Idaho National Laboratory's 504-node Dell PowerEdge C6420 cluster purchased in 2018 as the successor to Falcon, with dual Intel Xeon Gold 6148 20-core processors per node, 192 GB of memory per node and an Omni-Path fabric. TOP500 lists 20,160 cores, Rmax 1.00 PFlop/s, Rpeak 1.55 PFlop/s and 219.5 kW under CentOS; it appeared only on the November 2018 list, at rank 427. The documentation of the C3+3 collaboration (University of Idaho, Boise State and Idaho State) says INL turned the hardware over to the three universities in April 2025, rebuilt on Rocky Linux 8.10, so INL's own service is recorded as ending then although the cluster continues under the universities. The INL site is not named in a fetched page, so no site is recorded.
Timeline
- 2018 First operational source
- 2018-11 Listed at #427 on the TOP500 (November 2018) source
- 2025-04 Decommissioned source
- 2026-02-23 Idaho's three public research universities announced Lemhi in service for academic research as the replacement for Falcon, hosted at INL's Collaborative Computing Center and run day to day by the University of Idaho source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-07 Added Lemhi, Idaho National Laboratory's Dell cluster
Nearby in scale
The machines closest to Lemhi by Rmax, smaller to larger.
- Konrad (HLRN-III) · Germany, decommissioned · 0.99 PFlop/s
- HOKUSAI GreatWave · Japan, decommissioned · 0.99 PFlop/s
- Raijin (NCI) · Australia, decommissioned · 0.98 PFlop/s
- Zenith (Dell EMC) · USA, operational · 1.01 PFlop/s
- ASPIRE 1 · Singapore, decommissioned · 1.01 PFlop/s
- CRESCO6 · Italy, operational · 1.01 PFlop/s
Related systems
Same operator
- Sawtooth · USA, operational, 2019
- INL Falcon · USA, decommissioned, 2014
- Fission (INL) · USA, operational, 2011
- Teton · USA, operational, 2026
- Ice Storm · USA, operational, 2007
- Wind River · USA, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| docs.c3plus3.org | names system and part | Intel Xeon Gold 6148, Omni-Path Architecture |
| top500.org | names system and part | Intel Xeon Gold 6148, Omni-Path Architecture, CentOS |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.