Supercomputers/Systems/KIT AI Data Center

Germany · planned · mixed

KIT AI Data Center

Also known as KIT Campus North AI data center

Operated by Karlsruhe Institute of Technology at KIT Campus North .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
KIT plans the Campus North AI data center
Karlsruhe Institute of Technology
- Reported baxtel.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Stated investment 0.03 USD bn 2026-10 Operator stated KIT estimate EUR 24 million, shown as 27.2 million dollars by Baxtel baxtel.com
Facility power 2 MW 2026-10 Design target Expected consumption 2 MW with option to reach 10 MW; IT capacity not yet fixed baxtel.com

The read

A planned KIT data center on Campus North beside a combined heat and power plant, estimated at EUR 24 million, with construction expected to finish at the end of 2029 and operation from 2030. Baxtel, quoting KIT, gives an expected power draw of 2 MW with the option to scale to 10 MW if demand holds, IT capacity not yet fixed, and waste heat fed into the campus district heating. Martin Nussbaumer, a director at KIT's Scientific Computing Center, describes a 'breathing' design that serves AI applications by day and simulation such as climate research at night. It is a separate, later project from the running `horeka-2` on the same campus; no hardware is named.

Timeline

Site & facility

KIT Campus North

Location
Eggenstein-Leopoldshafen, Germany