COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Dane

USA · operational · hpc

Dane

Also known as LLNL CTS-2 Dane

Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
7.04 PFlop/s
HPL measured
Rpeak
7.91 PFlop/s
Rmax ÷ Rpeak
89.0%
Cores
123,648
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge C6620 CTS-2
Dell Technologies - Verified top500.orghpc.llnl.gov
CPU -
Intel Xeon Platinum 8480+ 56C 2GHz (Sapphire Rapids)
Intel - Reported top500.orghpc.llnl.gov
Interconnect Omni-Path Architecture
Interconnect
Fat tree · 100 Gb/s per port · About 1 microsecond
Cornelis Networks Omni-Path
Cornelis Networks
- Verified top500.orghpc.llnl.gov
Operating system Tri-Lab Operating System Stack
Operating systems
Linux distribution, RHEL-derived, HPC-tuned · Open source, LLNL-maintained
TOSS 4
Lawrence Livermore National Laboratory
- Verified hpc.llnl.govtop500.org

The read

Livermore's CTS-2 capacity cluster for the NNSA's Advanced Simulation and Computing programme, a Dell PowerEdge C6620 system of Intel Sapphire Rapids nodes on a Cornelis Networks Omni-Path fabric running TOSS. TOP500 lists Xeon Platinum 8480+ 56C 2GHz, 123,648 cores, Rmax 7.04 and Rpeak 7.91 PFlop/s; it debuted 107th in November 2023 and was 244th in June 2026. LLNL's platform page gives a larger machine, 1,544 nodes of 112 cores (167,552 cores) and 10.7 PFlop/s CPU peak, commissioned 2023 with 256 GB DDR5 per node, so the TOP500 run covers a subset and its figures are the ones recorded. The LLNL page lists Dane under the CZ zone with CTS-2 class and ASC and M&IC programme use.

Timeline

  • 2023 First operational source
  • 2023-11 List debut at #107 (November 2023) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Livermore Computing Center

Location
Livermore, CA, USA
Cooling
Direct liquid cooling (warm water)
Commissioned
1996

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
hpc.llnl.govnames system and partTri-Lab Operating System Stack
top500.orgnames system and partOmni-Path Architecture

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.