Supercomputers/Systems/Technion Zeus
Israel · operational · mixed
Technion Zeus
Also known as Zeus; Technion HPC; Athena DGX cluster
Operated by Technion at Technion HPC Facility (Haifa) .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Accelerator | NVIDIA A100 (in DGX A100) Accelerators NVIDIA A100, eight per DGX node, nine DGX nodes (72 GPUs) | NVIDIA | 72 reported | Reported | cis.technion.ac.il |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W NVIDIA Tesla V100 on Zeus Public C4140 nodes (8 GPUs) | NVIDIA | 8 reported | Reported | cis.technion.ac.il |
| CPU | AMD EPYC 7742 (Rome) CPUs x86-64 · 64C · 2.25 GHz · 7 nm · 225 W AMD EPYC 7742 in the DGX cluster nodes | AMD | - | Reported | cis.technion.ac.il |
| CPU | AMD EPYC 7713 (Milan) CPUs x86-64 · 64C · 2 GHz · 7 nm · 225 W AMD EPYC 7713 on Zeus MAFAT XL225 nodes | AMD | - | Reported | cis.technion.ac.il |
| CPU | Intel Xeon Platinum 8358 CPUs x86-64 · 32C · 2.6 GHz · 10 nm · 250 W Intel Xeon Platinum 8358 on Zeus Public XL220 nodes | Intel | - | Reported | cis.technion.ac.il |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds 200 Gbps InfiniBand interconnecting all nodes | NVIDIA | - | Reported | cis.technion.ac.il |
The read
The Technion's campus HPC environment run by its Division of Computing and Information Systems under the name Zeus, described as 200 nodes with 12,036 CPU cores and 96 NVIDIA GPUs on 200 Gbps InfiniBand. The hardware table lists Zeus Public SD530 (24 nodes, Xeon Gold 6230), Public C4140 (2 nodes, 8 V100), Public XL220 (12 nodes, Xeon Platinum 8358), Zeus-MK DL560 (40 nodes), MAFAT XL225 (18 nodes, EPYC 7713), MAFAT DL385 (24 nodes, EPYC 9654/9754) and a DGX cluster of nine DGX A100 nodes with 72 A100 GPUs and EPYC 7742, also offered as the pay-per-use Athena GPU cluster. The table's per-cluster core counts sum to more than the 12,036 headline and its GPU rows sum to 80 rather than 96, so no core total is recorded. Installation dates and a peak figure are not published. Both cited pages are the Technion's own, so the tier is reported.
Timeline
No dated events recorded.
Site & facility
Change history
- 2026-10-04 Technion Zeus added, the Technion's campus HPC environment in Haifa with a nine-node DGX A100 cluster (72 A100 GPUs) and 200 Gbps InfiniBand
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| cis.technion.ac.il | names system only | - |
| cis.technion.ac.il | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.