Supercomputers/Systems/Forerunner 1
Taiwan · operational · hpc
Forerunner 1
Operated by National Center for High-Performance Computing at NCHC Tainan Branch .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.53 PFlop/s
- Rpeak
- 4.00 PFlop/s
- Rmax ÷ Rpeak
- 88.3%
- Cores
- 62,496
- Power
- 614.87 kW
- Per watt
- 5.7 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Forerunner 1, and those in Taiwan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.53 PFlop/s | #194 of 234 · bottom 18% | #8 of 12 · bottom 37% |
| Energy efficiency | 5.7 GF/W | #109 of 121 · bottom 11% | #7 of 10 · bottom 34% |
| Rmax ÷ Rpeak | 88.3 % | #33 of 231 · top 14% | #2 of 10 · top 11% |
| Power draw | 615 kW | #63 of 126 · top 50% | #5 of 10 · top 44% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - ASUS RS723Q-E11-RS24 servers (TOP500 vendor ASUSTeK / ASUS Cloud / Taiwan Web Service Corporation) | ASUS | - | Reported | top500.org |
| CPU | Intel Xeon Platinum 8480C CPUs x86-64 · 56C · 2 GHz · Intel 7 · 350 W Intel Xeon Platinum 8480+ 56C 2.0GHz, two per node across 558 x86-64 nodes | Intel | - | Verified | top500.orgnchc.org.tw |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds InfiniBand NDR200, 200 Gb/s per node | NVIDIA | - | Verified | top500.orgnchc.org.tw |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription Red Hat Enterprise Linux | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What Forerunner 1 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 598 nodes558 x86-64 CPU nodes (62,496 cores) plus 40 ARM nodes for heterogeneous-architecture testing | 2024-07 | Operator stated | nchc.org.tw |
| Storage capacity | 9.2 PB | 2024-07 | Operator stated | nchc.org.tw |
| Interconnect and topology | High-performance InfiniBand, same as Taiwania 3 | 2024-07 | Operator stated | nchc.org.tw |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Job scheduler | Slurm | 2024-07 | Operator stated | nchc.org.tw |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | NARLabs and the National Science and Technology Council (Taiwan)Page names the organisations but gives no amounts | 2024-07 | Operator stated | nchc.org.tw |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Preliminary results (2024): billion-scale fluid mechanics workloads at NCHU and NCKU cut from several months to 40 hours; NTU ocean-atmosphere tests 80 percent more efficient than on Taiwania 3 | 2024-07 | Operator stated | nchc.org.tw |
The read
NCHC's Tainan-branch system that replaced Taiwania 1: 558 x86-64 nodes with two 56-core Intel Xeon Platinum 8480+ CPUs and 512 GB each on 200 Gb/s InfiniBand (62,496 cores), built with ASUS servers, plus 40 Arm-architecture nodes for heterogeneous testing and 9.2 PB of storage. NCHC announced activation in July 2024 and quotes about 3.5 PFlop/s; TOP500 gives Rmax 3.53, Rpeak 4.00 and 614.87 kW, first listed 221st in November 2023 and 359th in November 2025. NCHC and TOP500 agree on the core count and processor. TOP500 gives the installation year as 2023.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Forerunner 1 added, verified on TOP500 and NCHC
Nearby in scale
The machines closest to Forerunner 1 by Rmax, smaller to larger.
Related systems
Same operator
- Nano 4 · Taiwan, operational, 2025
- Nano 4 GB200 · Taiwan, operational, 2025
- Taiwania · Taiwan, decommissioned, 2018
- Formosa 5 · Taiwan, operational, 2012
- ALPS (NCHC) · Taiwan, decommissioned, 2011
- Nano 5 · Taiwan, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Intel Xeon Platinum 8480C, NVIDIA InfiniBand NDR (Quantum-2) |
| nchc.org.tw | names system and part | NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.