Supercomputers/Systems/GMO GPU Cloud
Japan · operational · ai training
GMO GPU Cloud
Operated by GMO Internet Group .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 10.05 PFlop/s
- Rpeak
- 17.36 PFlop/s
- Rmax ÷ Rpeak
- 57.9%
- Cores
- 35,328
- Power
- 186.78 kW
- Per watt
- 53.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of GMO GPU Cloud, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 10.05 PFlop/s | #125 of 234 · bottom 48% | #27 of 131 · top 20% |
| Energy efficiency | 53.8 GF/W | #34 of 121 · top 27% | #1 of 74 · highest |
| Rmax ÷ Rpeak | 57.9 % | #205 of 231 · bottom 12% | #115 of 130 · bottom 13% |
| Power draw | 187 kW | #90 of 126 · bottom 30% | #55 of 74 · bottom 27% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge XE9640 | Dell Technologies | - | Reported | top500.org |
| Accelerator | NVIDIA H200 SXM Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 256 NVIDIA H200 GPUs across 32 server nodes | NVIDIA | 256 reported | Reported | internet.gmo |
| CPU | - Xeon Platinum 8480L 56C 2GHz | Intel | - | Reported | top500.org |
| Interconnect | - NVIDIA Spectrum-X Ethernet | NVIDIA | - | Verified | internet.gmotop500.org |
Engineering, funding and access
What GMO GPU Cloud runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | NVIDIA Spectrum-X EthernetGMO describes it as the first Japanese adoption of Spectrum-X; TOP500 lists NVIDIA Spectrum-X Ethernet | 2025-06 | Operator stated | internet.gmotop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | DDN high-speed distributed storage | 2026 | Operator stated | gpucloud.gmo |
| Job scheduler | Slurm, in the managed HPC cluster offering | 2026 | Operator stated | gpucloud.gmo |
| Programming and software stack | Ubuntu 22.04.4 LTS operating system, NVIDIA NVCC 12.8 and OpenMPI 4.1.7rc1 for the TOP500 run | 2026-06 | Operator stated | top500.org |
| Programming and software stack | NVIDIA AI Enterprise available on the service | 2026 | Operator stated | gpucloud.gmo |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Commercial GPU cloud: managed HPC cluster and bare-metal offerings arranged through GMO inquiry, quote and contract flow | 2026 | Operator stated | gpucloud.gmo |
| Access page | gpucloud.gmo | 2026 | Operator stated | gpucloud.gmo |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2026: awarded ClusterMAX Silver, described by GMO as the first such certification in Japan | 2026 | Operator stated | gpucloud.gmo |
| Notable result | 2025: 34th on the June 2025 Green500 at 53.81 GFlops/W, first in Japan, with a 10.05 PFlop/s LINPACK on 32 nodes and 256 H200 GPUs | 2025-06 | Operator stated | internet.gmo |
The read
GMO Internet Group's GPU cloud service, launched in November 2024. GMO's June 2025 release states a 32-node, 256-GPU NVIDIA H200 configuration on NVIDIA Spectrum-X networking that measured 10.05 PFlop/s and 53.81 GFlops/Watt, ranking 34th on the June 2025 Green500 and first in Japan; TOP500 lists the same 10.05 PFlop/s, Rpeak 17.36 PFlop/s, 35,328 cores and 186.78 kW on a Dell PowerEdge XE9640 with Xeon Platinum 8480L hosts and Ubuntu 22.04.4, ranking it 141st in June 2025, 164th in November 2025 and 185th in June 2026. TOP500's page text names the accelerator as a Tesla GP100, which conflicts with GMO's H200, so the H200 comes from the operator. A larger 96-node, 768-GPU H200 run of 38.06 PFlop/s was 37th on the November 2024 TOP500 per GMO; that run is not the one carried in this row.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added GMO GPU Cloud, a Japanese H200 cloud
Nearby in scale
The machines closest to GMO GPU Cloud by Rmax, smaller to larger.
Related systems
Same accelerator
- ARF-ACC · Turkey, operational, 2024
- Helma · Germany, operational, 2024
- Nebius Mäntsälä Cluster · Finland, operational
- Reindeer · USA, operational, 2024
- Tesla Cortex · USA, operational, 2024
- ABCI 3.0 · Japan, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| internet.gmo | names system, part and count | NVIDIA H200 SXM · counts: 256 |
| top500.org | names system and part | NVIDIA H200 SXM |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.