Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
41.50 PFlop/s
HPL measured
Rpeak
52.68 PFlop/s
Rmax ÷ Rpeak
78.8%
Cores
74,880
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Israel-1, and those in Israel. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax41.50 PFlop/s#46 of 257 · top 18%-
Rmax ÷ Rpeak78.8 %#89 of 256 · top 35%-

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
256 Dell PowerEdge XE9680 servers
Dell Technologies - Verified dell.comhiper-global.com
Accelerator NVIDIA H100 SXM5
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
256 servers of eight NVIDIA H100 80GB GPUs each
NVIDIA 2,048
reported
Verified dell.comcalcalistech.com
CPU Intel Xeon Platinum 8480C
CPUs
x86-64 · 56C · 2 GHz · Intel 7 · 350 W
TOP500 lists "Xeon Platinum 8480+ 56C 2GHz"; Dell describes two 4th Gen Intel Xeon Processors per node
Intel - Reported top500.org
Interconnect NVIDIA Spectrum-4
Networking
Ethernet switch ASIC · 51.2 Tb/s aggregate, 64 ports at 800G
NVIDIA Spectrum-X Ethernet fabric: Spectrum-4 switches with BlueField-3 SuperNICs and DPUs
NVIDIA - Verified hiper-global.comdell.com
Operating system Ubuntu Server
Operating systems
Linux distribution · Open source, free with paid support tiers
Ubuntu 22.04
Canonical
- Reported top500.org

Engineering, funding and access

What Israel-1 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes256 nodesFull system of 256 HGX H100 systems; phase one, live in November 2023, used 128 of them.2023-11Press reportcalcalistech.com
Interconnect and topologyNVIDIA Spectrum-X Ethernet: Spectrum-4 switches (80 in the full system) and BlueField-3 DPUs (2,560 in the full system)TOP500 entry lists NVIDIA Spectrum-X Ethernet.2023-11Press reportcalcalistech.comtop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackUbuntu 22.04, NVIDIA NVCC, CUDA 12.2, Intel Composer XE and MKL 2020.4-912 and NVIDIA HPC-X 2.14 (as submitted for the TOP500 HPL run)2026-06Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
ProcurementPhase one of 128 Dell PowerEdge XE9680 HGX H100 systems completed in under 20 weeks, nearly two months ahead of schedule; full build is 256 systems with 2,048 H100 GPUs2023-11Press reportcalcalistech.com

Access

ItemDetailAs ofBasisSource
How researchers get timeNVIDIA R&D teams and select partners; intended to support Israeli companies building AI2023-11Press reportcalcalistech.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 2,048 accelerators 2023-11 Design target Calcalist: 2,048 H100 GPUs at full completion (256 HGX servers); phase one is 1,024 GPUs and 128 servers. calcalistech.com

The read

NVIDIA's own commercial AI supercomputer at its Yokneam site, built with Dell on 256 PowerEdge XE9680 servers. Phase 1 (1,024 H100 GPUs) went live in November 2023 under two months ahead of schedule per Calcalistech; the full 2,048-GPU build is what TOP500 benchmarked, 34th on the November 2024 list, its best-ever rank, since overtaken by newer systems through June 2026. NVIDIA is both the vendor of the silicon and the operator of record, an unusual case in this dataset. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

NVIDIA Israel (Yokneam)

Location
Yokneam, Israel
Commissioned
2023

Change history

Nearby in scale

The machines closest to Israel-1 by Rmax, smaller to larger.

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
calcalistech.comnames system, part and countNVIDIA H100 SXM5, NVIDIA Spectrum-4 · counts: 2048
top500.orgnames system and partIntel Xeon Platinum 8480C, NVIDIA H100 SXM5, Ubuntu Server

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.