Supercomputers/Systems/Israel-1
Israel · operational · ai training
Israel-1
Operated by NVIDIA at NVIDIA Israel (Yokneam) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 41.50 PFlop/s
- Rpeak
- 52.68 PFlop/s
- Rmax ÷ Rpeak
- 78.8%
- Cores
- 74,880
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Israel-1, and those in Israel. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 41.50 PFlop/s | #46 of 257 · top 18% | - |
| Rmax ÷ Rpeak | 78.8 % | #89 of 256 · top 35% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - 256 Dell PowerEdge XE9680 servers | Dell Technologies | - | Verified | dell.comhiper-global.com |
| Accelerator | NVIDIA H100 SXM5 Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W 256 servers of eight NVIDIA H100 80GB GPUs each | NVIDIA | 2,048 reported | Verified | dell.comcalcalistech.com |
| CPU | Intel Xeon Platinum 8480C CPUs x86-64 · 56C · 2 GHz · Intel 7 · 350 W TOP500 lists "Xeon Platinum 8480+ 56C 2GHz"; Dell describes two 4th Gen Intel Xeon Processors per node | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA Spectrum-4 Networking Ethernet switch ASIC · 51.2 Tb/s aggregate, 64 ports at 800G NVIDIA Spectrum-X Ethernet fabric: Spectrum-4 switches with BlueField-3 SuperNICs and DPUs | NVIDIA | - | Verified | hiper-global.comdell.com |
| Operating system | Ubuntu Server Operating systems Linux distribution · Open source, free with paid support tiers Ubuntu 22.04 | Canonical | - | Reported | top500.org |
Engineering, funding and access
What Israel-1 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 256 nodesFull system of 256 HGX H100 systems; phase one, live in November 2023, used 128 of them. | 2023-11 | Press report | calcalistech.com |
| Interconnect and topology | NVIDIA Spectrum-X Ethernet: Spectrum-4 switches (80 in the full system) and BlueField-3 DPUs (2,560 in the full system)TOP500 entry lists NVIDIA Spectrum-X Ethernet. | 2023-11 | Press report | calcalistech.comtop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Ubuntu 22.04, NVIDIA NVCC, CUDA 12.2, Intel Composer XE and MKL 2020.4-912 and NVIDIA HPC-X 2.14 (as submitted for the TOP500 HPL run) | 2026-06 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Phase one of 128 Dell PowerEdge XE9680 HGX H100 systems completed in under 20 weeks, nearly two months ahead of schedule; full build is 256 systems with 2,048 H100 GPUs | 2023-11 | Press report | calcalistech.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | NVIDIA R&D teams and select partners; intended to support Israeli companies building AI | 2023-11 | Press report | calcalistech.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 2,048 accelerators | 2023-11 | Design target | Calcalist: 2,048 H100 GPUs at full completion (256 HGX servers); phase one is 1,024 GPUs and 128 servers. | calcalistech.com |
The read
NVIDIA's own commercial AI supercomputer at its Yokneam site, built with Dell on 256 PowerEdge XE9680 servers. Phase 1 (1,024 H100 GPUs) went live in November 2023 under two months ahead of schedule per Calcalistech; the full 2,048-GPU build is what TOP500 benchmarked, 34th on the November 2024 list, its best-ever rank, since overtaken by newer systems through June 2026. NVIDIA is both the vendor of the silicon and the operator of record, an unusual case in this dataset. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
- 2023-06 Announced source
- 2023-11 First operational source
- 2024-11 Listed at #34 on the TOP500 (November 2024) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-09-24 Added: first supercomputer from Israel in the dataset, operated by NVIDIA itself
Nearby in scale
The machines closest to Israel-1 by Rmax, smaller to larger.
- Pre-Eos · USA, operational · 40.66 PFlop/s
- Viettel H200 AI Platform · Vietnam, operational · 40.21 PFlop/s
- MareNostrum 5 GPP · Spain, operational · 40.1 PFlop/s
- JUWELS Booster · Germany, operational · 44.12 PFlop/s
- Reindeer · USA, operational · 45.59 PFlop/s
- Ubilink H100 Cluster · Taiwan, operational · 45.82 PFlop/s
Related systems
Same operator
- Eos · USA, operational, 2023
- Pre-Eos · USA, operational, 2023
- Taipei-1 · Taiwan, operational
- Cambridge-1 · United Kingdom, operational, 2021
- Tethys · USA, operational, 2021
- NVIDIA DGX SuperPOD (A100) · USA, operational, 2020
Same accelerator
- CoreWeave AI cluster for Inflection AI · USA, operational, 2023
- CZI GPU Cluster · USA, operational
- DeepL Mercury · Sweden, operational, 2023
- Eagle · USA, operational, 2023
- ISEG · Netherlands, operational, 2023
- Kempner AI Cluster · USA, operational, 2023
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| calcalistech.com | names system, part and count | NVIDIA H100 SXM5, NVIDIA Spectrum-4 · counts: 2048 |
| top500.org | names system and part | Intel Xeon Platinum 8480C, NVIDIA H100 SXM5, Ubuntu Server |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.