COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/Lynx (LLNL)

USA · operational · hpc

Lynx (LLNL)

Also known as LLNL/NNSA CTS-2 Lynx

Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
5.65 PFlop/s
HPL measured
Rpeak
6.45 PFlop/s
Rmax ÷ Rpeak
87.6%
Cores
100,800
Power
986.45 kW
Per watt
5.7 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge C6620 servers (CTS-2)
Dell Technologies - Reported top500.orgstoragenewsletter.com
CPU -
Intel Xeon Platinum 8480+ 56C 2 GHz
Intel - Reported top500.org
Interconnect -
Cornelis Networks CN5000 400G Omni-Path fabric, 952 nodes
Cornelis Networks
- Reported storagenewsletter.comtop500.org
Operating system Tri-Lab Operating System Stack
Operating systems
Linux distribution, RHEL-derived, HPC-tuned · Open source, LLNL-maintained
Linux/TOSS (Tri-Laboratory Operating System Stack)
Lawrence Livermore National Laboratory
- Reported top500.org

The read

Livermore's newest Commodity Technology Systems-2 (CTS-2) cluster: a 952-node system of Dell PowerEdge servers with Intel Xeon processors and the Cornelis CN5000 400G Omni-Path fabric, which Cornelis announced as deployed at ISC 2026 (June 2026), saying it adds production capacity for NNSA's Advanced Simulation and Computing program and wider national security work. TOP500 (June 2026, 277th; the list is full for our table so no list row is added) lists a Dell PowerEdge C6620 with Xeon Platinum 8480+ 56C 2 GHz, Cornelis CN5000 and TOSS, installation year 2026, 100,800 cores, Rmax 5.65 and Rpeak 6.45 PFlop/s and 986.45 kW. 100,800 cores is 900 dual-socket 56-core nodes, fewer than the 952 nodes Cornelis cites, so the benchmark run appears to have used part of the machine (our inference, not stated by either source). Sibling CTS-2 systems at the lab are Dane and Bengal (llnl-dane, llnl-bengal).

Timeline

Site & facility

Livermore Computing Center

Location
Livermore, CA, USA
Cooling
Direct liquid cooling (warm water)
Commissioned
1996

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
storagenewsletter.comdoes not name this system-
top500.orgnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading