Companies/Tesla

USA

Tesla

Trains its driving models on the Cortex cluster at Gigafactory Texas and discloses its size in its quarterly update decks.

Systems this company appears in

Systems
2
Aggregate Rmax
0.0 GFlop/s
systems it appears in
Aggregate power
0 kW
where disclosed
First appearance
2023-07
Most recent
2026-04
Concentration
-
largest is Tesla Cortex 2

Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.

Role breakdown

Role Systems Rmax in those systems
Integrator 1 0.0 GFlop/s
Accelerator 1 0.0 GFlop/s

Appearances

System Supplied as Shipped under Rmax Rank
Tesla Cortex 2
USA · 2026-04
Integrator Tesla - unranked
Tesla Dojo
USA · 2023-07
Accelerator Tesla - unranked

Parts supplied

Part Category Generation Released
Tesla Dojo D1 Accelerators D1 (Dojo v1) 2021

AI datacenters operated

SystemStatusAcceleratorsStated power (MW)
Tesla Cortex operational 50,000 -
Tesla Dojo decommissioned - -
Tesla Cortex 2 operational - -

Figures come from the AI datacenter metrics; blank means none recorded.

Sites operated

Site Location Cooling Commissioned
Tesla Gigafactory Texas Austin, TX, USA - 2024

Related news

  • DensityAI: Chip startup founded by former Tesla Dojo execs valued at $10bn – report · Data Center Dynamics
    Former leads of Tesla's Dojo chip program, shut down in August 2025, have founded DensityAI, reportedly raising a $10bn-valuation round with a performance-contingent purchase agreement from AWS for a new accelerator built around 3D-stacked DRAM -- a concrete example of an abandoned in-house chip effort seeding an independent merchant-silicon entrant. Sourced to a single outlet (The Information) with Amazon, Andreessen Horowitz and DensityAI all declining to confirm the details, so treat as reported rather than verified.
  • NVIDIA Launches DSX Ready to Qualify Power and Cooling Products for AI Factories · HPCwire
    NVIDIA's new DSX Ready program formalizes third-party qualification of power and cooling hardware against its AI-factory reference design, launching with battery storage from Hitachi Energy, LG Energy Solution and Tesla and cooling-distribution units from LG Electronics, LiquidStack and Vertiv -- a sign that the compute supply chain's constraint is shifting from the accelerators themselves toward the power and thermal infrastructure needed to run them at rack scale. Single-sourced to NVIDIA's own announcement (republished by HPCwire), so recorded as reported rather than verified.
  • NVIDIA Launches DSX Ready to Qualify Power and Cooling Products for AI Factories · NVIDIA Blog
    NVIDIA's new DSX Ready program formally qualifies third-party power and cooling hardware against its AI-factory reference design, starting with battery storage (Hitachi Energy, LG Energy Solution, Tesla) and liquid-cooling CDUs (LG Electronics, LiquidStack, Vertiv). It's a structural move: NVIDIA is now gatekeeping which power/cooling vendors count as compatible with its rack designs, which shapes who wins facility-layer contracts downstream of the GPU purchase.