Wonder Valley AI Campus
Also known as Wonder Valley Data Centre Park; O'Leary Wonder Valley
Operated by O'Leary Ventures at Wonder Valley Site (Greenview AB) .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - O'Leary Ventures develops the Wonder Valley AI data centre park, 1.4 GW first phase and 7.5 GW at full build-out | O'Leary Ventures | - | Reported | siteselection.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Stated investment | 70 USD bn | 2026-10 | Design target | Developer's total planned investment for the 7.5 GW build-out (first phase about 12 billion dollars); a plan, not spend to date. | siteselection.com |
| Facility power | 7,500 MW | 2026-10 | Design target | Planned full build-out; first phase 1.4 GW. A later Energy Mix report cites 9 GW. | siteselection.comgensler.com |
The read
Wonder Valley, a planned gas-powered AI data centre park in the Municipal District of Greenview near Grande Prairie, Alberta, led by Kevin O'Leary's O'Leary Ventures and announced on 10 December 2024. Site Selection reports a first phase of 1.4 GW at about 12 billion dollars and a 7.5 GW full build-out at about 70 billion dollars on roughly 7,000 acres, with groundbreaking in 2027 and operations from mid-2028; Gensler's project page describes 50+ hyperscale data centres on the same 7.5 GW basis. A later Energy Mix report says the plan has since grown to 9 GW and records April 2026 regulatory events (exemption from an environmental impact assessment and a dismissed water-licence challenge). No tenant, accelerator vendor or count is named. The tier is reported. It has never submitted an HPL result.
Timeline
- 2024-12-10 Announced source
Site & facility
Wonder Valley Site (Greenview AB)
- Location
- Municipal District of Greenview (Grande Prairie), AB, Canada
Change history
- 2026-10-04 Added Wonder Valley AI Campus (O'Leary Ventures)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| siteselection.com | names system only | - |
| gensler.com | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.