Supercomputers/Systems/Campus AI Fouju

France · under construction · ai training

Campus AI Fouju

Also known as MGX-Bpifrance-Mistral-NVIDIA Paris AI campus

Operated by Campus AI at Fouju AI Campus Site .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Campus AI joint venture develops the campus
Campus AI
- Reported lavoixdefrance.fr
Accelerator -
NVIDIA is a Campus AI shareholder and GPU supplier; model and count not disclosed
NVIDIA - Reported itsocial.fr

Compute deals

All compute deals. Headline values are as announced, not additive.

The read

Flagship site of Campus AI, the Bpifrance, Mistral AI, MGX and NVIDIA joint venture, at Fouju in Seine-et-Marne near Paris. La Voix de France reports a planned 1.4 GW total, grid access from RTE of 240 MW by 2027 rising to 700 MW by 2029, and an operational launch targeted for 2028; the June 2026 agreement extends Campus AI to a 3 GW national network. Mistral has priority access to capacity, with 96 MW secured at Fouju and a contractual ramp to 200 MW. The sources disagree on stage: one says construction is underway, another that it begins in the second half of 2026, so under_construction reflects that construction is starting now. GPU model and count are not published. Separate from the operational Mistral Campus AI at Bruyeres-le-Chatel.

Timeline

Site & facility

Fouju AI Campus Site

Location
Fouju, Seine-et-Marne, France

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
lavoixdefrance.frnames system only-
middleeastainews.comnames system only-