Supercomputers/Systems/LOEWE-CSC

Germany · decommissioned · hpc

LOEWE-CSC

Also known as LOEWE CSC cluster Frankfurt

Operated by Goethe University Frankfurt .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
285.20 TFlop/s
HPL measured
Rpeak
469.73 TFlop/s
Rmax ÷ Rpeak
60.7%
Cores
15,120
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of LOEWE-CSC, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax285.20 TFlop/s#67 of 177 · top 37%#67 of 95 · bottom 31%
Rmax ÷ Rpeak60.7 %#161 of 177 · bottom 10%#80 of 94 · bottom 16%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Supermicro cluster (Clustervision/Supermicro)
Supermicro - Reported top500.org
Accelerator -
ATI Radeon GPU
AMD - Reported top500.org
CPU -
AMD Opteron 6172 12C 2.1 GHz
AMD - Reported top500.orghkhlr.de
Interconnect Mellanox InfiniBand QDR
Interconnect
Fat tree · 40 Gb/s per 4x port
Infiniband QDR
NVIDIA - Reported top500.org

Engineering, funding and access

What LOEWE-CSC runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes832 nodes832 computers in 34 water-cooled racks, with 20,928 cores and 778 GPGPU accelerators2011-12-07Press reportcomputerwoche.de
Total memory56 TB2011-12-07Press reportcomputerwoche.de
Storage capacity2.26 PBHKHLR lists 1.5 PB of permanent plus 0.76 PB of scratch storage (1.5 + 0.76 = 2.26); Computerwoche gave 2 PB of disk in 20112026-11Operator statedhkhlr.decomputerwoche.de
Interconnect and topologyInfiniBand QDRHKHLR measured about 9.7 to 9.9 GB/s internode MPI bandwidth and 1.8 to 1.9 microseconds latency2010-11Operator statedtop500.orgcomputerwoche.de
Cooling designInternal water cooling with heat exchangers in the rack doors, run at 30 degrees C and rejected through two coupled cooling towers; cooling overhead about 7 percent of IT power against a usual 40 to 100 percentData centre at Industriepark Hoechst, planned and built by Infraserv Hoechst in three months, 500 kW nominal and expandable to 1 MW; the cooling water can also heat nearby buildings2011-12-07Press reportcomputerwoche.de

Software

ItemDetailAs ofBasisSource
Parallel filesystemParallel scratch file system of 764 TB with 10 GB/s aggregate bandwidthHKHLR lists 0.76 PB of scratch and 1.5 PB of permanent storage2011-12-07Press reportcomputerwoche.dehkhlr.de
Job schedulerSlurm Workload Manager, with exclusive node allocation and a 30-day maximum runtime2026-11Operator statedhkhlr.de

Funding

ItemDetailAs ofBasisSource
Funded byState of Hesse, through its LOEWE research initiative2011-12-07Press reportcomputerwoche.de
Funded byDeutsche Forschungsgemeinschaft (DFG)2011-12-07Press reportcomputerwoche.de
Funding programmeLOEWE, the Hessian state research initiative launched in 2008 with EUR 410 million planned through 20132011-12-07Press reportcomputerwoche.de
ProcurementComputer including tender and incidental costs about EUR 5.2 million; data centre with cooling about EUR 750,000; racks, water piping and low-voltage distribution about EUR 300,000; electricity about EUR 580,000 a yearCosts are in euros only, so no USD figure is recorded2011-12-07Press reportcomputerwoche.de

Access

ItemDetailAs ofBasisSource
How researchers get timeReserved for projects from academic institutions in Hesse; Goethe University Frankfurt hosts it, with Giessen, TU Darmstadt, Kassel and Marburg as participating universities2026-11Operator statedhkhlr.de

Results

ItemDetailAs ofBasisSource
Notable result2011: Green IT Best Practice Award 2011 in the visionary overall concepts category, at 718.14 MFlop/s per wattComputerwoche calls it one of the first CO2-neutral supercomputers, powered from the Hoechst industrial park grid supplied by biogas and waste recovery2011-12-07Press reportcomputerwoche.de

The read

Goethe University Frankfurt's heterogeneous GPU cluster, 22nd on the November 2010 TOP500 with 15,120 cores, 285.2 TFlop/s Rmax and 469.7 TFlop/s Rpeak. TOP500 lists a Supermicro cluster built with Clustervision, AMD Opteron 6172 12-core 2.1 GHz CPUs, ATI Radeon GPUs and InfiniBand QDR. The Hessian competence centre HKHLR documents the AMD nodes as dual-socket 12-core Opteron 6172 machines and states that the LOEWE cluster has been switched off, with Goethe-HLR as its successor.

Timeline

  • 2010 First operational source
  • 2010-11 Listed at #22 on the TOP500 (November 2010) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to LOEWE-CSC by Rmax, smaller to larger.

  • Piz Kesch · Switzerland, decommissioned · 0.28 PFlop/s
  • ABACUS I · Mexico, operational · 0.28 PFlop/s
  • Tachyon II · South Korea, decommissioned · 0.27 PFlop/s
  • Tornado SUSU · Russia, upgraded · 0.29 PFlop/s
  • Abacus 2.0 · Denmark, operational · 0.29 PFlop/s
  • Lobachevsky · Russia, operational · 0.29 PFlop/s

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
hkhlr.denames system only-
top500.orgnames system and partMellanox InfiniBand QDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading