Supercomputers/Systems/Cielo
USA · decommissioned · classified
Cielo
Also known as Cray XE6 at Los Alamos
Operated by Los Alamos National Laboratory at Los Alamos Strategic Computing Complex .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.11 PFlop/s
- Rpeak
- 1.37 PFlop/s
- Rmax ÷ Rpeak
- 81.3%
- Cores
- 142,272
- Power
- 3.98 MW
- Per watt
- 0.3 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Cray XE6 | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | top500.org |
| CPU | - Opteron 6136 8C 2.40GHz | AMD | - | Reported | top500.org |
| Interconnect | Cray Gemini Interconnect 3D torus · About 6 GB/s per direction per link · Around 1 microsecond Cray Gemini interconnect | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | top500.org |
The read
Cray XE6 for the NNSA Advanced Simulation and Computing program, run for Los Alamos and Sandia. TOP500 lists 142,272 Opteron 6136 8-core 2.4 GHz cores on the Gemini interconnect at 1.11 PFLOPS Rmax, sixth on the November 2011 list. Wikipedia describes it as the laboratory's primary system after Roadrunner's 2013 retirement, used for milestone weapons calculations, and gives 29 September 2016 as the decommissioning date; only the month is recorded. TOP500 is the only source for Rmax, Rpeak, cores and power, so the tier is reported.
Timeline
- 2011 First operational source
- 2011-11 List debut at #6 (November 2011) source
- 2016-09 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Los Alamos Strategic Computing Complex
- Location
- Los Alamos, NM, USA
- Cooling
- Chilled water
- Commissioned
- 1993
Change history
- 2026-10-02 Added Cielo, the LANL and Sandia Cray XE6, sixth on the November 2011 TOP500
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| en.wikipedia.org | names system only | - |
| top500.org | names system and part | Cray Gemini |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.