Supercomputers/Systems/CoreWeave Taloja AI Campus
India · planned · ai training
CoreWeave Taloja AI Campus
Also known as CoreWeave India 240 MW; AdaniConneX Taloja
Operated by CoreWeave at CoreWeave Taloja Navi Mumbai Campus .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - CoreWeave is sole tenant across three 80 MW buildings at AdaniConneX's Taloja campus in Navi Mumbai and will own and run the compute | CoreWeave | - | Reported | coreweave.com |
| Accelerator | NVIDIA Vera Rubin Accelerators NVIDIA Vera Rubin platform planned for the 240 MW Taloja campus; no unit count stated | NVIDIA | - | Reported | coreweave.comthenextweb.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Facility power | 240 MW | 2026-10-06 | Design target | CoreWeave states 240 MW of data center capacity in three 80 MW buildings; IT versus total not stated. First phase expected mid-2028. | coreweave.comthenextweb.com |
The read
CoreWeave's first India deployment, announced 6 October 2026: 240 MW across three 80 MW buildings at AdaniConneX's Taloja campus in Navi Mumbai, with CoreWeave as sole tenant and an option to add up to another 240 MW. CoreWeave plans to deploy the NVIDIA Vera Rubin platform, with direct liquid cooling for the GPU halls and a non-evaporative chilled water system. The first phase is expected in mid-2028 and no GPU count is stated. AdaniConneX is a 50:50 joint venture of Adani Enterprises and EdgeConneX per The Next Web. The second page is trade press repeating the CoreWeave release, so the tier is reported. It has never submitted an HPL result.
Timeline
- 2026-10-06 Announced source
Site & facility
CoreWeave Taloja Navi Mumbai Campus
- Location
- Navi Mumbai, India
- Cooling
- Direct liquid cooling for GPU data halls with a non-evaporative chilled water system
Change history
- 2026-10-09 Added CoreWeave Taloja AI Campus
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| coreweave.com | names system and part | NVIDIA Vera Rubin |
| thenextweb.com | names system and part | NVIDIA Vera Rubin |
Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.