Supercomputers/Systems/Matrix
USA · operational · hpc
Matrix
Also known as LLNL CTS-2 Matrix
Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.11 PFlop/s
- Rpeak
- 3.50 PFlop/s
- Rmax ÷ Rpeak
- 88.9%
- Cores
- 12,800
- Power
- 84.3 kW
- Per watt
- 36.9 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Matrix, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.11 PFlop/s | #181 of 202 · bottom 11% | #113 of 332 · top 34% |
| Energy efficiency | 36.9 GF/W | #60 of 99 · bottom 41% | #21 of 162 · top 12% |
| Rmax ÷ Rpeak | 88.9 % | #25 of 199 · top 12% | #30 of 331 · top 9% |
| Power draw | 84 kW | #95 of 104 · bottom 10% | #161 of 171 · bottom 7% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge XE9640 | Dell Technologies | - | Verified | top500.orghpc.llnl.gov |
| Accelerator | NVIDIA H100 SXM5 Accelerators CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W NVIDIA H100, four per compute node (112 GPUs per LLNL) | NVIDIA | 112 reported | Reported | hpc.llnl.govtop500.org |
| CPU | - Intel Xeon Platinum 8480+ | Intel | - | Reported | top500.orghpc.llnl.gov |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Infiniband NDR | NVIDIA | - | Reported | top500.orghpc.llnl.gov |
| Operating system | Tri-Lab Operating System Stack Operating systems Linux distribution, RHEL-derived, HPC-tuned · Open source, LLNL-maintained TOSS 4 | Lawrence Livermore National Laboratory | - | Verified | hpc.llnl.govtop500.org |
Engineering, funding and access
What Matrix runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 30 nodes26 batch, 2 debug and 2 login nodes; table elsewhere on the page lists a 35-node pbatch pool | 2026 | Operator stated | hpc.llnl.gov |
| Interconnect and topology | InfiniBand | 2026 | Operator stated | hpc.llnl.gov |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre parallel file space under /p/lustre | 2026 | Operator stated | hpc.llnl.gov |
| Job scheduler | Slurm, GPU-scheduled; minimum allocation 1 GPU, 28 cores, 128 GB | 2026 | Operator stated | hpc.llnl.gov |
| Programming and software stack | TOSS 4 operating system | 2026 | Operator stated | hpc.llnl.gov |
The read
A small GPU partition of Livermore's CTS-2 line, a Dell PowerEdge XE9640 system with Intel Xeon Platinum 8480+ hosts and NVIDIA H100 GPUs on InfiniBand NDR, running TOSS. TOP500 lists 12,800 cores, Rmax 3.11, Rpeak 3.50 PFlop/s and 84.3 kW; it debuted 406th in November 2025 and was 432nd in June 2026. LLNL's platform page gives 30 nodes (2 login, 26 batch, 2 debug) with four H100 GPUs per compute node, 112 GPUs in total, 1,792 CPU cores, 512 GB DDR5 per node and about 4.0 PFlop/s combined peak, installed 2025 in limited availability. The TOP500 core count does not match the LLNL page, so it is carried as published.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Change history
- 2026-10-04 Added Matrix (llnl)
Nearby in scale
The machines closest to Matrix by Rmax, smaller to larger.
- Lichtenberg II Phase 2 · Germany, operational · 3.1 PFlop/s
- ASEAN-Korea HPC Facility · Indonesia, operational · 3.1 PFlop/s
- Komondor · Hungary, operational · 3.1 PFlop/s
- IronMan (Dell) · USA, operational · 3.11 PFlop/s
- Thunder (AFRL) · USA, operational · 3.13 PFlop/s
- Vader · USA, operational · 3.14 PFlop/s
Related systems
Same site
- Tuolumne · USA, operational, 2025
- El Capitan · USA, operational, 2024
- Lynx (LLNL) · USA, operational, 2026
- Neo · USA, operational, 2026
- rzAdams · USA, operational, 2024
- Bengal · USA, operational, 2023
Same operator
- Dane · USA, operational, 2023
- RZHound · USA, operational, 2023
- rzVernal · USA, operational, 2022
- Tenaya · USA, operational, 2022
- Tioga · USA, operational, 2022
- Magma (LLNL) · USA, operational, 2020
Same accelerator
- ABCI-Q · Japan, operational, 2025
- Bank of America HPC-AI · USA, operational, 2025
- Harpia · Brazil, operational, 2025
- Otus · Germany, operational, 2025
- Rorqual · Canada, operational, 2025
- Shakti Cloud · India, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.llnl.gov | names system, part and count | NVIDIA H100 SXM5, Tri-Lab Operating System Stack · counts: 112 |
| top500.org | names system and part | NVIDIA H100 SXM5, NVIDIA InfiniBand NDR (Quantum-2) |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.