COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Atlas (Petrobras)

Brazil · operational · hpc

Atlas (Petrobras)

Also known as Atlas

Operated by Petrobras at Cenpes .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
4.38 PFlop/s
HPL measured
Rpeak
8.85 PFlop/s
Rmax ÷ Rpeak
49.5%
Cores
91,936
Power
546.58 kW
Per watt
8.0 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Bull 4029GP-TVRT
Bull
ATOEPA rolls up to Atos
- Reported top500.org
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
NVIDIA Tesla V100
NVIDIA - Reported top500.org
CPU -
Xeon Gold 6240 18C 2.6GHz
Intel - Reported top500.org
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
Infiniband EDR
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.org

The read

Petrobras's 2020 Bull 4029GP-TVRT cluster of Xeon Gold 6240 (18-core, 2.6 GHz) CPUs with NVIDIA Tesla V100 GPUs on InfiniBand EDR running CentOS, 91,936 cores at 4.38 PFlop/s Rmax and 8.85 PFlop/s Rpeak on 547 kW. Debuted at rank 56 on the June 2020 list and stood at rank 324 on June 2026. Petrobras's 2024 procurement notice says Fenix, Atlas and Dragao will be decommissioned once the new primary machine is operational, and Harpia (already in this dataset) is that replacement, but Atlas was still on the June 2026 TOP500, which is the basis for the operational status. The Cenpes location is taken from Petrobras's coverage of its research-centre machines, not from TOP500 itself.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Cenpes

Location
Rio de Janeiro, Brazil
Commissioned
2025

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partNVIDIA Tesla V100, Mellanox InfiniBand EDR

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading