Supercomputers/Systems/Formosa 5
Taiwan · operational · hpc
Formosa 5
Also known as NCHC Formosa 5 GPU cluster
Operated by National Center for High-Performance Computing .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 89.94 TFlop/s
- Rpeak
- 155.08 TFlop/s
- Rmax ÷ Rpeak
- 58.0%
- Cores
- 4,968
- Power
- 110 kW
- Per watt
- 0.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Formosa 5, and those in Taiwan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 89.94 TFlop/s | #172 of 193 · bottom 12% | #12 of 12 · bottom 1% |
| Energy efficiency | 0.8 GF/W | #98 of 149 · bottom 35% | #10 of 10 · bottom 1% |
| Rmax ÷ Rpeak | 58.0 % | #173 of 192 · bottom 11% | #10 of 10 · bottom 1% |
| Power draw | 110 kW | #139 of 151 · bottom 9% | #10 of 10 · bottom 1% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - NCHC built the cluster in-house (listed as self-made) | National Center for High-Performance Computing | - | Reported | top500.orgnchc.org.tw |
| Accelerator | - NVIDIA Tesla 2070 GPUs | NVIDIA | - | Reported | top500.orgnchc.org.tw |
| CPU | Intel Xeon X5670 CPUs x86-64 · 6C · 2.93 GHz · 32 nm · 95 W Intel Xeon X5670 6C 2.93GHz | Intel | - | Reported | top500.orgnchc.org.tw |
| Interconnect | Mellanox InfiniBand QDR Interconnect Fat tree · 40 Gb/s per 4x port InfiniBand QDR interconnect | NVIDIA | - | Reported | top500.orgnchc.org.tw |
Engineering, funding and access
What Formosa 5 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | HPL run used Intel Composer XE 2011 SP1, Intel MKL and Open MPITOP500 list entry | 2012-06 | Operator stated | top500.org |
The read
NCHC's in-house built CPU plus GPU hybrid cluster of Xeon X5670 hosts with NVIDIA Tesla 2070 GPUs on QDR InfiniBand, the fifth of the Formosa series. NCHC's own system history and the TOP500 agree on 4,968 cores, 89.94 TFlop/s Linpack and 155.08 TFlop/s peak; it ranked 232nd in June 2012 (Green500 62nd per NCHC) and 374th in November 2012.
Timeline
- 2012 First operational source
- 2012-06 Listed at #232 on the TOP500 (June 2012) source
- 2018-05 With Taiwania unveiled, NARL said it would decommission Formosa 5, along with ALPS and Iris, by September 2018 source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Status: Operational, last listed in November 2012 against NARL planned to decommission it by September 2018. No source we fetched confirms the switch-off itself.
Change history
- 2026-10-07 Added Formosa 5
Nearby in scale
The machines closest to Formosa 5 by Rmax, smaller to larger.
- Epic (iVEC) · Australia, operational · 0.09 PFlop/s
- CHEOPS (Cologne) · Germany, operational · 0.09 PFlop/s
- T2K Todai · Japan, decommissioned · 0.08 PFlop/s
- Fission (INL) · USA, operational · 0.09 PFlop/s
- Virgo (IIT Madras) · India, operational · 0.09 PFlop/s
- BGW · USA, decommissioned · 0.09 PFlop/s
Related systems
Same operator
- ALPS (NCHC) · Taiwan, decommissioned, 2011
- Taiwania · Taiwan, decommissioned, 2018
- Forerunner 1 · Taiwan, operational, 2024
- Nano 4 · Taiwan, operational, 2025
- Nano 4 GB200 · Taiwan, operational, 2025
- Nano 5 · Taiwan, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| nchc.org.tw | names system and part | Intel Xeon X5670, Mellanox InfiniBand QDR |
| top500.org | names system and part | Intel Xeon X5670, Mellanox InfiniBand QDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.