COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Intel Paragon XP/S 150

USA · decommissioned · hpc

Intel Paragon XP/S 150

Also known as XP/S-MP 150

Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
127.1 GFlop/s
HPL measured
Rpeak
154.0 GFlop/s
Rmax ÷ Rpeak
82.5%
Cores
3,072
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Intel Paragon XP/S-MP 150
Intel - Reported top500.orgornl.gov
CPU Intel i860/XP
CPUs
i860 RISC · 1C · 0.05 GHz · 1000 nm
Intel i860 XP 50 MHz
Intel 3,072
reported
Reported top500.orgornl.gov
Interconnect Intel Paragon 2D mesh
Interconnect
2D mesh with torus wraparound · 200 MB/s per link
2-D mesh (torus)
Intel - Reported top500.orgornl.gov

The read

Intel's largest Paragon, installed at ORNL's Center for Computational Sciences in January 1995 and dedicated that April as the last machine under a 1992 contract. ORNL describes 1,024 compute nodes with three i860 processors each (3,096 processors, over 150 GFlop/s peak); TOP500 counts 3,072 cores and 127.1 GFlop/s Rmax, third on the June 1995 list and again in December 1995, and it stayed listed until November 1999. The June 1995 list is the edition recorded here. No source we fetched gives a shutdown date, so none is recorded. TOP500 is the only source for Rmax, so the tier is reported.

Timeline

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Oak Ridge Leadership Computing Facility

Location
Oak Ridge, TN, USA
Utility
Tennessee Valley Authority
Cooling
Direct liquid cooling (warm water)
Commissioned
1993

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system only · counts: 3072
ornl.govcould not be fetched-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading