Intel Paragon XP/S 150
Also known as XP/S-MP 150
Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 127.1 GFlop/s
- Rpeak
- 154.0 GFlop/s
- Rmax ÷ Rpeak
- 82.5%
- Cores
- 3,072
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Intel Paragon XP/S-MP 150 | Intel | - | Reported | top500.orgornl.gov |
| CPU | Intel i860/XP CPUs i860 RISC · 1C · 0.05 GHz · 1000 nm Intel i860 XP 50 MHz | Intel | 3,072 reported | Reported | top500.orgornl.gov |
| Interconnect | Intel Paragon 2D mesh Interconnect 2D mesh with torus wraparound · 200 MB/s per link 2-D mesh (torus) | Intel | - | Reported | top500.orgornl.gov |
The read
Intel's largest Paragon, installed at ORNL's Center for Computational Sciences in January 1995 and dedicated that April as the last machine under a 1992 contract. ORNL describes 1,024 compute nodes with three i860 processors each (3,096 processors, over 150 GFlop/s peak); TOP500 counts 3,072 cores and 127.1 GFlop/s Rmax, third on the June 1995 list and again in December 1995, and it stayed listed until November 1999. The June 1995 list is the edition recorded here. No source we fetched gives a shutdown date, so none is recorded. TOP500 is the only source for Rmax, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Oak Ridge Leadership Computing Facility
- Location
- Oak Ridge, TN, USA
- Utility
- Tennessee Valley Authority
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1993
Change history
- 2026-10-02 Added the Intel Paragon XP/S 150 at Oak Ridge, third on the June 1995 TOP500
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system only | · counts: 3072 |
| ornl.gov | could not be fetched | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.