Supercomputers/Systems/Bengal
USA · operational · hpc
Bengal
Also known as LLNL/NNSA CTS-2 Bengal
Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 7.20 PFlop/s
- Rpeak
- 8.09 PFlop/s
- Rmax ÷ Rpeak
- 89.0%
- Cores
- 107,520
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Bengal, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 7.20 PFlop/s | #156 of 257 · bottom 40% | #66 of 332 · top 20% |
| Rmax ÷ Rpeak | 89.0 % | #27 of 256 · top 10% | #29 of 331 · top 8% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell CTS-2 | Dell Technologies | - | Verified | top500.orghpc.llnl.gov |
| CPU | - Intel Xeon Platinum 8480+ 56C 2GHz (Sapphire Rapids) | Intel | - | Reported | top500.orghpc.llnl.gov |
| Interconnect | Omni-Path Architecture Interconnect Fat tree · 100 Gb/s per port · About 1 microsecond Cornelis Networks Omni-Path | Cornelis Networks | - | Verified | top500.orghpc.llnl.gov |
| Operating system | Tri-Lab Operating System Stack Operating systems Linux distribution, RHEL-derived, HPC-tuned · Open source, LLNL-maintained TOSS 4 | Lawrence Livermore National Laboratory | - | Verified | hpc.llnl.govtop500.org |
Engineering, funding and access
What Bengal runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,158 nodes1,158 nodes total, of which 1,122 are batch nodes and 9 are login nodes; each has 112 Sapphire Rapids cores and 256 GiB | 2026 | Operator stated | hpc.llnl.gov |
| Interconnect and topology | Cornelis Networks Omni-Path (200 Gb/s Omni-Path Express in the CTS-2 design) | 2026 | Operator stated | hpc.llnl.govllnl.gov |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre parallel file space (/p/lustre) | 2026 | Operator stated | hpc.llnl.gov |
| Job scheduler | Slurm, node-scheduled main batch queue | 2026 | Operator stated | hpc.llnl.gov |
| Programming and software stack | TOSS 4 operating system | 2026 | Operator stated | hpc.llnl.gov |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | NNSA Advanced Simulation and Computing (ASC) program | 2023 | Operator stated | llnl.gov |
| Funding programme | Commodity Technology Systems 2 (CTS-2) contract under NNSA ASC | 2023 | Operator stated | llnl.govhpc.llnl.gov |
| Procurement | Dell Technologies CTS-2 system built from scalable units of about 1.5 PFlop/s using Dell PowerEdge C6620 and R760 servers with 4th Gen Intel Xeon Scalable processors | 2023 | Operator stated | llnl.gov |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Access limited to the NNSA ASC and Multiprogrammatic and Institutional Computing (M&IC) programs; Bengal sits in the classified SCF zone with Slurm pools for debug, batch, serial, dev and CI | 2026 | Operator stated | hpc.llnl.gov |
The read
The Secure Computing Facility counterpart of Dane: a Dell CTS-2 cluster of Intel Sapphire Rapids nodes on Cornelis Networks Omni-Path, running TOSS 4 under Slurm. TOP500 lists Xeon Platinum 8480+ 56C 2GHz, 107,520 cores, Rmax 7.20 and Rpeak 8.09 PFlop/s; it debuted 128th in November 2023 and was 242nd in June 2026. LLNL's platform page gives 1,158 nodes (1,122 batch) of 112 cores, 125,664 cores in all, 256 GiB DDR5 per node and 7.966 PFlop/s CPU peak, installed 2023 and in limited-availability mode, so the TOP500 run is a subset and its figures are the ones recorded.
Timeline
- 2023 First operational source
- 2023-11 Listed at #128 on the TOP500 (November 2023) source
- 2023-11 Bengal was listed on the November 2023 TOP500 at rank 129 with 6.134 PFlop/s according to LLNL. source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Cores and Rmax: 107,520 cores, Rmax 7.20 PFlop/s as recorded against 125,664 cores (LLNL); 6.134 PFlop/s in November 2023 (LLNL article). Possibly different submissions or scopes; the LLNL page and the TOP500 entry disagree.
Change history
- 2026-10-04 Added Bengal (llnl)
Nearby in scale
The machines closest to Bengal by Rmax, smaller to larger.
- Sandia CTS-2 Mead · USA, operational · 7.06 PFlop/s
- Dane · USA, operational · 7.04 PFlop/s
- Met Office Cray XC40 · United Kingdom, decommissioned · 7.04 PFlop/s
- Gautschi AI · USA, operational · 7.26 PFlop/s
- Artemis (G42) · United Arab Emirates, operational · 7.26 PFlop/s
- Svartisen · Norway, operational · 7.4 PFlop/s
Related systems
Same site
- Dane · USA, operational, 2023
- RZHound · USA, operational, 2023
- El Capitan · USA, operational, 2024
- rzAdams · USA, operational, 2024
- rzVernal · USA, operational, 2022
- Tenaya · USA, operational, 2022
Same operator
- Tioga · USA, operational, 2022
- Matrix · USA, operational, 2025
- Tuolumne · USA, operational, 2025
- Lynx (LLNL) · USA, operational, 2026
- Magma (LLNL) · USA, operational, 2020
- Neo · USA, operational, 2026
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hpc.llnl.gov | names system and part | Tri-Lab Operating System Stack |
| top500.org | names system and part | Omni-Path Architecture |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.