Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.05 PFlop/s
HPL measured
Rpeak
1.47 PFlop/s
Rmax ÷ Rpeak
71.4%
Cores
23,040
Power
500 kW
Per watt
2.1 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of QB-2, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax1.05 PFlop/s#69 of 245 · top 28%#177 of 332 · bottom 48%
Energy efficiency2.1 GF/W#57 of 198 · top 28%#83 of 162 · bottom 50%
Rmax ÷ Rpeak71.4 %#179 of 243 · bottom 27%#190 of 331 · bottom 44%
Power draw500 kW#101 of 199 · bottom 50%#88 of 171 · bottom 50%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell C8220X cluster
Dell Technologies - Reported top500.orghpc.lsu.edu
Accelerator NVIDIA Tesla K20X
Accelerators
CUDA (Kepler GK110) · 2,688C · 0.732 GHz · 28 nm · 235 W
NVIDIA Tesla K20x GPUs on 480 nodes
NVIDIA - Reported top500.orghpc.lsu.edu
CPU -
Intel Xeon E5-2680v2 10C 2.8 GHz (Ivy Bridge-EP), two per node, 504 nodes
Intel - Reported top500.orghpc.lsu.edu
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
Infiniband FDR
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.org
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
Red Hat Enterprise Linux 6
Red Hat
IBMNYSE rolls up to IBM
- Reported top500.orghpc.lsu.edu

Engineering, funding and access

What QB-2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes504 nodesTwo 10-core Ivy Bridge-EP Xeons and 64 GB per node; 480 nodes carry NVIDIA Tesla K20x; Dell hardware.2019-03Operator statedhpc.lsu.edu

Software

ItemDetailAs ofBasisSource
Programming and software stackRHEL 62019-03Operator statedhpc.lsu.edu

Access

ItemDetailAs ofBasisSource
How researchers get timeLouisiana Optical Network Infrastructure (LONI) allocationsLSU slides list QB2 as a LONI resource at 1,500 TFlop/s peak.2019-03Operator statedhpc.lsu.edu

The read

Louisiana Optical Network Infrastructure (LONI) GPU cluster, run by HPC@LSU in the Information Systems Building in Baton Rouge. LSU HPC's Spring 2019 slides list QB2 as a Dell cluster of 504 compute nodes with two 10-core 2.8 GHz Ivy Bridge-EP Xeons and 64 GB each, 480 nodes carrying NVIDIA Tesla K20x GPUs, RHEL 6, a 1,500 TFlop/s peak and a June 2018 TOP500 rank of 232. TOP500 first listed it at 47th in November 2014 (23,040 cores counting GPU cores, 1,052 TFlop/s Rmax, 1,473.6 TFlop/s Rpeak, 500 kW, FDR InfiniBand) and keeps it through June 2019 (474th). The operator is entered as LSU because HPC@LSU runs it; TOP500 names the site as the Louisiana Optical Network Initiative. Two independent organisations agree on the hardware, so the tier is verified.

Timeline

  • 2014 First operational source
  • 2014-11 Listed at #47 on the TOP500 (November 2014) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to QB-2 by Rmax, smaller to larger.

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partMellanox InfiniBand FDR
hpc.lsu.edudoes not name this system-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading