Supercomputers/Systems/HA-PACS
Japan · decommissioned · hpc
HA-PACS
Also known as Highly Accelerated Parallel Advanced system for Computational Sciences
Operated by University of Tsukuba at Tsukuba Center for Computational Sciences .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 421.60 TFlop/s
- Rpeak
- 778.13 TFlop/s
- Rmax ÷ Rpeak
- 54.2%
- Cores
- 20,800
- Power
- 407.29 kW
- Per watt
- 1.0 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of HA-PACS, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 421.60 TFlop/s | #82 of 193 · top 42% | #89 of 131 · bottom 33% |
| Energy efficiency | 1.0 GF/W | #64 of 149 · top 43% | #58 of 74 · bottom 23% |
| Rmax ÷ Rpeak | 54.2 % | #179 of 192 · bottom 8% | #121 of 130 · bottom 8% |
| Power draw | 407 kW | #82 of 151 · bottom 47% | #46 of 74 · bottom 39% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Xtreme-X GreenBlade 8204 | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | - NVIDIA Tesla M2090 GPUs, four per node | NVIDIA | - | Reported | top500.orgccs.tsukuba.ac.jp |
| CPU | Intel Xeon E5-2670 CPUs x86-64 · 8C · 2.6 GHz · 32 nm · 115 W Two Intel Sandy Bridge-EP E5-2670 8C 2.6 GHz per node, 268 nodes | Intel | 268 reported | Reported | top500.orgccs.tsukuba.ac.jp |
| Interconnect | Mellanox InfiniBand QDR Interconnect Fat tree · 40 Gb/s per 4x port Dual-rail Infiniband QDR fat-tree | NVIDIA | - | Reported | top500.orgccs.tsukuba.ac.jp |
Engineering, funding and access
What HA-PACS runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 268 nodesBase cluster only; each node has two Sandy Bridge-EP Xeons and four NVIDIA Tesla M2090 GPUs. The HA-PACS/TCA extension of October 2013 is not included | 2012-02 | Operator stated | ccs.tsukuba.ac.jpccs.tsukuba.ac.jp |
| Total memory | 34 TBTotal stated in the launch release; the base-cluster page gives 128 GB DDR3-1600 host memory and 24 GB of GPU memory per node | 2012-02 | Operator stated | ccs.tsukuba.ac.jp |
| Storage capacity | 504 TB504 TB Lustre shared disk; the base-cluster page names a DDN SFA10000 ExaScaler | 2012-02 | Operator stated | ccs.tsukuba.ac.jpccs.tsukuba.ac.jp |
| Interconnect and topology | Dual-rail InfiniBand QDR fat tree (Mellanox ConnectX-3 dual-head adapters, two 288-port IS5300 switches), about 2.1 TB/s bisection bandwidthLaunch release gives 2.1 TB/s and the supercomputers page 2.14 TB/s; TOP500 lists Infiniband QDR | 2012-02 | Operator stated | ccs.tsukuba.ac.jptop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre shared file system, 504 TB user area on a DDN SFA10000 ExaScaler | 2012-02 | Operator stated | ccs.tsukuba.ac.jpccs.tsukuba.ac.jp |
| Job scheduler | PBS Pro, under Appro Cluster Engine system management | 2012-02 | Operator stated | ccs.tsukuba.ac.jp |
| Programming and software stack | HPL run used GCC 4.4.5, CUDA Toolkit 4.1, Intel MKL 10.3 and Intel MPI 4.0TOP500 list entry | 2012-06 | Operator stated | top500.org |
| Programming and software stack | MPI libraries MVAPICH2, Intel MPI and Open MPI; Fortran 90, C and C++ compilers | 2012-02 | Operator stated | ccs.tsukuba.ac.jp |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Japan's Ministry of Education, Culture, Sports, Science and Technology (MEXT) | 2012-02 | Operator stated | ccs.tsukuba.ac.jpccs.tsukuba.ac.jp |
| Funding programme | MEXT special expenditure within the national university operating grant, for a three-year CCS project from FY2011 to build an exascale-oriented interdisciplinary computational science baseRelease is in Japanese | 2012-02 | Operator stated | ccs.tsukuba.ac.jp |
| Procurement | Introduced from FY2011 as a commodity CPU and GPU cluster; Appro supplied the Xtreme-X GreenBlade 8200 nodes and cluster software, delivered January 2012; CCS built the TCA extension in-house | 2012-02 | Operator stated | ccs.tsukuba.ac.jpccs.tsukuba.ac.jp |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | CCS Interdisciplinary Collaborative Use Program, which offered about 70 percent of HA-PACS/TCA resources in the FY2017 callCall is in Japanese; by then only the TCA part was listed as operating | 2016-12-26 | Operator stated | project.ccs.tsukuba.ac.jp |
The read
The eighth-generation PACS/PAX machine at Tsukuba's Center for Computational Sciences. The base cluster has 268 nodes, each with two 8-core 2.6 GHz Sandy Bridge-EP Xeons and four NVIDIA M2090 GPUs, on dual-rail InfiniBand QDR fat-tree with 504 TB of Lustre storage, 802 TFlop/s peak as delivered in January 2012. TOP500 lists it 41st in June 2012 with 421.6 TFlop/s Rmax. A 64-node TCA extension with K20X GPUs was added in 2013 and is listed separately by TOP500. CCS Tsukuba's supercomputer page (https://www.ccs.tsukuba.ac.jp/eng/supercomputers/) says the HA-PACS base cluster was shut down in March 2017; a later CCS overview of Cygnus says March 2018, and the HA-PACS/TCA part ran until October 2018.
Timeline
- 2012 First operational source
- 2012-06 Listed at #41 on the TOP500 (June 2012) source
- 2013-10 The HA-PACS/TCA extension, with FPGA-based tightly coupled accelerators for direct GPU-to-GPU links, was completed, adding 364 TFlop/s peak for a total of 1.166 PFlop/s source
- 2017-03 The HA-PACS base cluster was shut down in March 2017 source
- 2018-10 The HA-PACS/TCA extension was shut down in October 2018 source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Tsukuba Center for Computational Sciences
- Location
- Tsukuba, Japan
- Commissioned
- 1996
Change history
- 2026-11-08 HA-PACS retirement date added
- 2026-10-02 Added HA-PACS, Tsukuba's GPU cluster
Nearby in scale
The machines closest to HA-PACS by Rmax, smaller to larger.
- NETL HPCEE · USA, operational · 0.41 PFlop/s
- Computerome 1 · Denmark, operational · 0.41 PFlop/s
- Triolith · Sweden, decommissioned · 0.41 PFlop/s
- Swierk Computing Centre · Poland, operational · 0.42 PFlop/s
- SciPhi-XVI · USA, decommissioned · 0.43 PFlop/s
- Red Sky · USA, decommissioned · 0.43 PFlop/s
Related systems
Same site
- COMA (PACS-IX) · Japan, decommissioned, 2014
- T2K Tsukuba · Japan, decommissioned, 2008
- PACS-CS · Japan, decommissioned, 2006
- Cygnus · Japan, decommissioned, 2019
- Pegasus (Tsukuba) · Japan, operational
- Sirius (Tsukuba) · Japan, operational, 2026
Same operator
- CP-PACS · Japan, decommissioned, 1996
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| ccs.tsukuba.ac.jp | names system, part and count | Mellanox InfiniBand QDR · counts: 268 |
| top500.org | names system and part | Intel Xeon E5-2670, Mellanox InfiniBand QDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.