Supercomputers/Systems/Artemis (G42)
United Arab Emirates · operational · mixed
Artemis (G42)
Also known as Artemis
Operated by G42 .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 7.26 PFlop/s
- Rpeak
- 9.49 PFlop/s
- Rmax ÷ Rpeak
- 76.5%
- Cores
- 107,568
- Power
- 673 kW
- Per watt
- 10.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Artemis (G42), and those in United Arab Emirates. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 7.26 PFlop/s | #61 of 230 · top 26% | #4 of 8 · top 43% |
| Energy efficiency | 10.8 GF/W | #41 of 129 · top 31% | - |
| Rmax ÷ Rpeak | 76.5 % | #44 of 224 · top 19% | #4 of 8 · top 43% |
| Power draw | 673 kW | #64 of 132 · top 48% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - NVIDIA DGX-2 systems | NVIDIA | - | Reported | top500.org |
| Accelerator | NVIDIA Tesla V100 Accelerators CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W NVIDIA Tesla V100 | NVIDIA | - | Reported | top500.org |
| CPU | - Xeon Platinum 8168 24C 2.7GHz | Intel | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds Infiniband EDR | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What Artemis (G42) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | InfiniBand EDRNVIDIA DGX-2 based system | 2019-11 | Operator stated | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Ubuntu operating system | 2019-11 | Operator stated | top500.org |
| Programming and software stack | Intel Composer XE, NVIDIA NVCC 10.0, Intel MKL and OpenMPI 3.1.4 (HPL run configuration) | 2019-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | G42 deployed the first phase with NVIDIA, announced 20 November 2019 | 2019-11 | Operator stated | g42.ai |
The read
Group 42's NVIDIA DGX-2 supercomputer in the UAE, TOP500 listing of Xeon Platinum 8168 24C hosts with NVIDIA Tesla V100 GPUs on InfiniBand EDR, 107,568 cores, 7.26 PFlop/s Rmax, 9.49 PFlop/s Rpeak and 673 kW. G42's 20 November 2019 announcement states a 26th place on the November 2019 TOP500, 7.2 PFlop/s of double-precision HPL and the first UAE entry in the top 100; its later TOP500 ranks run from 31st in June 2020 (19th on that month's Green500 at 10.783 GFlops/Watt) to 241st in June 2026. G42 does not publish the DGX-2 count or the site on the pages fetched, so the site is left blank.
Timeline
- 2019 First operational source
- 2019-11-20 G42 announced Artemis ranked 26th on the November 2019 TOP500 at 7.2 PFlop/s HPL, the first UAE system in the top 100. source
- 2020-06 Listed at #19 on the Green500 (June 2020) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Artemis, G42's DGX-2 supercomputer
Nearby in scale
The machines closest to Artemis (G42) by Rmax, smaller to larger.
- Gautschi AI · USA, operational · 7.26 PFlop/s
- Bengal · USA, operational · 7.2 PFlop/s
- Sandia CTS-2 Mead · USA, operational · 7.06 PFlop/s
- Svartisen · Norway, operational · 7.4 PFlop/s
- Isambard-AI · United Kingdom, operational · 7.42 PFlop/s
- Elice B200 Cluster · South Korea, operational · 7.47 PFlop/s
Related systems
Same operator
- G42 POD3 · United Arab Emirates, operational, 2019
- Stargate UAE · United Arab Emirates, under construction
Same accelerator
- Barbora · Czechia, operational, 2019
- Béluga · Canada, decommissioned, 2019
- Cannon (FASRC) · USA, upgraded, 2019
- cHARISMa · Russia, operational, 2019
- Christofari · Russia, operational, 2019
- COBALT 2.0 · Netherlands, operational, 2019
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA Tesla V100, Mellanox InfiniBand EDR |
| g42.ai | blocked our fetch | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.