Supercomputers/Systems/Omnia Pecem (TikTok)
Brazil · under construction · ai training
Omnia Pecem (TikTok)
Also known as ByteDance Ceara data center; TikTok Pecem data center hub
Operated by Omnia Data Centers at Pecem Export Processing Zone Site .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Omnia develops the 200 MW IT Pecem data centre for ByteDance, which funds the IT equipment | Omnia Data Centers | - | Reported | thenextweb.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Stated investment | 9.8 USD bn | 2026-10 | Operator stated | Combined three-party total: ByteDance 7 to 8 billion for IT equipment, Omnia about 2 billion for infrastructure, plus Casa dos Ventos wind capacity (about 3.5 billion reais). | thenextweb.com |
| Facility power | 300 MW | 2026-10 | Operator stated | Power consumption envelope of 300 MW supporting the 200 MW productive load. | thenextweb.cominfomoney.com.br |
| IT power | 200 MW | 2026-10 | Operator stated | First-phase productive load, reported by The Next Web on 18 May 2026 from the Omnia and Casa dos Ventos announcement. | thenextweb.com |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Wind and solar | Casa dos Ventos | - | contracted | 2026-05 | Third-party estimate | TNW citing Reuters: about 2 bn USD energy supply deal with Casa dos Ventos for wind power to the 200 MW campus; a 350 MW wind asset earmarked. Term and MW unstated. | thenextweb.com |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
Compute deals
- 2025-11-03: ByteDance and Omnia Data Centers (datacenter lease , 200 MW). infomoney.com.brthenextweb.com
All compute deals. Headline values are as announced, not additive.
The read
A 200 MW data centre in the Pecem port complex export processing zone (Caucaia, Ceara, Brazil) developed by Omnia Data Centers (Patria Investments) for ByteDance (TikTok), ByteDance's first dedicated infrastructure in Latin America. The first phase has about 200 MW of productive IT load inside a 300 MW power envelope; The Next Web (18 May 2026) puts the combined investment at about 9.8 billion dollars (7 to 8 billion of ByteDance IT equipment, about 2 billion for Omnia infrastructure, and Casa dos Ventos wind capacity under a 20-year energy contract) with first-phase operations expected in 2027. InfoMoney's earlier coverage notes that ByteDance had not publicly confirmed its participation at announcement. No accelerator vendor or count is stated. The tier is reported. It has never submitted an HPL result.
Timeline
- 2025 Announced source
Site & facility
Pecem Export Processing Zone Site
- Location
- Pecem (Caucaia), CE, Brazil
Change history
- 2026-10-04 Added Omnia Pecem (TikTok) (Omnia Data Centers)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| thenextweb.com | names system only | - |
| infomoney.com.br | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.