Supercomputers/Systems/Dawn
United Kingdom · operational · ai training
Dawn
Operated by University of Cambridge at University of Cambridge (CSD3) .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 19.46 PFlop/s
- Rpeak
- 53.85 PFlop/s
- Rmax ÷ Rpeak
- 36.1%
- Cores
- 156,864
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge XE9640 | Dell Technologies | - | Reported | hpc.cam.ac.ukdocs.hpc.cam.ac.uk |
| Accelerator | Intel Data Center GPU Max 1550 Accelerators oneAPI (Xe-HPC) · Intel 7 / TSMC N5 · 600 W four Intel Data Center GPU Max 1550 per node, 256 nodes | Intel | 1,024 estimated | Reported | docs.hpc.cam.ac.uk |
| CPU | Intel Xeon Platinum 8468 CPUs x86-64 · 48C · 2.1 GHz · Intel 7 · 350 W two Xeon Platinum 8468 per node, 256 nodes | Intel | 512 estimated | Reported | docs.hpc.cam.ac.uk |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds quad-rail NVIDIA Mellanox HDR200 InfiniBand | NVIDIA | - | Reported | docs.hpc.cam.ac.uk |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 1,024 accelerators | 2024-01 | Operator stated | Intel Data Center GPU Max 1550 count from the Dell/Intel-sourced CIO article; Cambridge says 'more than a thousand'. Phase 1 only. | cio.comcam.ac.uk |
The read
Cambridge's UK AI Research Resource system: 256 Dell PowerEdge XE9640 nodes, each with two Xeon Platinum 8468 CPUs and four Intel Data Center GPU Max 1550, on quad-rail HDR InfiniBand. Early access began in January 2024 and it ranked 40th in November 2023. Cambridge's own documentation is the only source for the hardware, and the GPU and CPU counts are our arithmetic from its node counts, so those quantities are marked estimated. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
University of Cambridge (CSD3)
- Location
- Cambridge, United Kingdom
- Commissioned
- 2024
Change history
- 2026-10-04 Added AI datacenter metrics for dawn
- 2026-09-20 Added with a rank pointer on the edition where it ranked highest
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| docs.hpc.cam.ac.uk | names system, part and count | Intel Data Center GPU Max 1550, Intel Xeon Platinum 8468, NVIDIA InfiniBand HDR · counts: 1024 |
| top500.org | names system and part | Intel Data Center GPU Max 1550, Intel Xeon Platinum 8468, NVIDIA InfiniBand HDR |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.