Supercomputers/Systems/Meta El Paso (Texas)

USA · under construction · ai training

Meta El Paso (Texas)

Also known as Meta El Paso AI data center

Operated by Meta Platforms at Meta El Paso AI Campus .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Meta builds the 1 GW El Paso AI data center, financed through a venture with BlackRock funds holding 80 percent
Meta Platforms - Reported investor.atmeta.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Stated investment 14 USD bn 2026-07 Operator stated Meta: about $14 bn total development cost for buildings and long-lived power, cooling, connectivity; BlackRock funds 80 percent, Meta 20 percent investor.atmeta.com
Stated investment 10 USD bn 2026-03 Operator stated Meta: $10 bn or more for the 1 GW El Paso campus, raised in March 2026 from an initial $1.5 bn; floor value about.fb.com
Facility power 1,000 MW 2026-03 Design target Meta: El Paso campus "will grow to 1 gigawatt"; BlackRock venture release says 1 GW of compute capacity, operations from 2028; both Meta statements datacenters.atmeta.cominvestor.atmeta.com

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Grid El Paso Electric - planned 2026-10 Operator stated Meta says it worked with El Paso Electric to plan energy supply and pays full costs; plans clean energy additions to the El Paso grid. No MW stated. datacenters.atmeta.comdatacenters.atmeta.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

The read

Meta's AI-optimized data center campus in El Paso, Texas, announced in October 2025 and confirmed in March 2026 as growing to 1 GW with more than 10 billion dollars of investment, served by El Paso Electric with a closed-loop liquid-cooled design. On 28 July 2026 Meta announced a venture with BlackRock funds, which take 80 percent, to finance the campus at roughly 14 billion dollars of total development cost, with operations to begin in 2028 and construction under way. Both pages are Meta's own and give no hardware, so the tier is reported.

Timeline

Site & facility

Meta El Paso AI Campus

Location
El Paso, TX, USA
Utility
El Paso Electric
Cooling
Closed-loop liquid cooling

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

One cited source was readable and does not mention this system; another could not be read because the host returned a bot challenge. The unreadable one may well be fine, so this is weaker evidence than a corroborated row and much stronger than an unsupported one. See how this check works.

Cited sourceResultFound on the page
datacenters.atmeta.comdoes not name this system-
investor.atmeta.comcould not be fetched-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.