COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Ares

Poland · operational · hpc

Ares

Operated by Cyfronet AGH at Cyfronet AGH, Krakow .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
2.34 PFlop/s
HPL measured
Rpeak
3.51 PFlop/s
Rmax ÷ Rpeak
66.7%
Cores
37,824
Power
486.85 kW
Per watt
4.8 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Huawei servers (TOP500 manufacturer), 532 + 256 CPU servers and 9 GPU servers
Huawei
- Reported top500.orgcyfronet.pl
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
72 NVIDIA Tesla V100 cards
NVIDIA 72
reported
Reported cyfronet.pl
CPU -
Intel Xeon Platinum 8268 24C 2.9GHz (TOP500); Cyfronet cites Xeon Platinum and Gold servers
Intel - Reported top500.orgcyfronet.pl
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
InfiniBand EDR
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.org
Operating system CentOS
Operating systems
Linux distribution, RHEL-compatible rebuild · Open source, community-maintained
CentOS
The CentOS Project
IBMNYSE rolls up to IBM
- Reported top500.org

The read

Cyfronet AGH's Krakow CPU cluster with a small GPU partition: 532 nodes with 192 GB plus 256 nodes with 384 GB of Intel Xeon Platinum and Gold CPUs (37,824 cores), and nine GPU servers carrying 72 NVIDIA Tesla V100 cards, on InfiniBand EDR with over 11 PB of storage. TOP500 credits Huawei as manufacturer and lists a Xeon Platinum 8268 24C 2.9GHz part. Cyfronet's own page quotes over 4 PFlop/s theoretical (3.5 CPU, 0.5 GPU), and TOP500 gives 3.51 PFlop/s Rpeak for the CPU-only Linpack run. TOP500 first listed it in 2021 and its last listing was 487th in November 2024. Cyfronet still shows the system as operational. TOP500 is the only source for Rmax and core count, so the tier is reported.

Timeline

Site & facility

Cyfronet AGH, Krakow

Location
Krakow, Poland
Commissioned
2021

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partMellanox InfiniBand EDR, CentOS
cyfronet.plnames system, part and countNVIDIA Tesla V100, Mellanox InfiniBand EDR · counts: 72

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading