Supercomputers/Systems/ServerDomes Hueco Ranch

USA · under construction · ai training

ServerDomes Hueco Ranch

Also known as Hueco Ranch dome data center campus

Operated by Kaufman & Company at Hueco Ranch Site (Hudspeth County) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
ServerDomes Global designs and builds the dome data centers
ServerDomes Global
- Reported baxtel.comkeycrew.co
Integrator -
Kaufman & Company develops the Hueco Ranch campus with Lonestar Kaufman Development Partners
Kaufman & Company
- Reported keycrew.cobaxtel.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Stated investment 15 USD bn 2026-10 Operator stated Reported 15 billion dollar campus; a developer figure, not a financing document baxtel.comkeycrew.co
Facility power 350 MW 2026-10 Design target Campus listed at 350 MW on ServerDomes Global's website per Baxtel; first 80 MW 16 months after construction start baxtel.com

The read

Kaufman & Company's 15 billion dollar campus of geodesic-dome data centers on roughly 24,000 acres of former ranch and oil land in Hudspeth County, Texas, about 28 miles east of El Paso, where ground was broken on 7 October 2026. Baxtel reports 350 MW planned, citing ServerDomes Global's website, with the first 80 MW running 16 months after construction starts; Kaufman said in July that phase one already has unnamed tenants and that up to ten more domes could follow over a decade. The domes are described as built for AI workloads, cooled by natural convection backed by hybrid air, direct-liquid and immersion cooling, with up to 90 percent of power from behind-the-meter sources including planned geothermal and solar; the site is in Rio Grande Electric Cooperative territory on the WECC grid, not ERCOT. County officials told local media they were not told before work began, and no state permit filings had surfaced. No accelerator vendor or count is stated.

Timeline

Site & facility

Hueco Ranch Site (Hudspeth County)

Location
Desert Haven, USA
Utility
Rio Grande Electric Cooperative
Cooling
Natural convection with hybrid air, direct liquid and immersion cooling