Supercomputers/Systems/Owens
USA · decommissioned · hpc
Owens
Also known as OSC Owens
Operated by Ohio Supercomputer Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 705.97 TFlop/s
- Rpeak
- 859.09 TFlop/s
- Rmax ÷ Rpeak
- 82.2%
- Cores
- 22,372
- Power
- 324 kW
- Per watt
- 2.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Owens, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 705.97 TFlop/s | #166 of 242 · bottom 33% | #194 of 332 · bottom 43% |
| Energy efficiency | 2.2 GF/W | #86 of 176 · top 49% | #76 of 162 · top 47% |
| Rmax ÷ Rpeak | 82.2 % | #52 of 238 · top 22% | #81 of 331 · top 24% |
| Power draw | 324 kW | #125 of 178 · bottom 31% | #116 of 171 · bottom 33% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge C6320/R730, 824 nodes | Dell Technologies | - | Reported | top500.orgosc.edu |
| Accelerator | NVIDIA Tesla P100 Accelerators CUDA (Pascal GP100) · 3,584C · 1.48 GHz · 16 nm · 300 W 160 GPU-ready R730 nodes with NVIDIA Tesla P100 (Pascal) 16 GB | NVIDIA | 160 reported | Reported | osc.edu |
| CPU | Intel Xeon E5-2680 v4 CPUs x86-64 · 14C · 2.4 GHz · 14 nm · 120 W Xeon E5-2680v4 14C 2.4GHz | Intel | - | Reported | top500.orgosc.edu |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds Mellanox EDR (100 Gbps) InfiniBand | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | top500.orgosc.edu |
Engineering, funding and access
What Owens runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 824 nodes648 Dell PowerEdge C6320 dense nodes, 160 R730 GPU nodes with NVIDIA Tesla P100 and 16 R930 huge-memory nodes, plus 4 login nodes | 2025 | Operator stated | osc.eduosc.edu |
| Total memory | 127 TBOSC technical specifications give total memory of about 127 TB; standard nodes have 128 GB and huge-memory nodes 1,536 GB | 2025 | Operator stated | osc.edu |
| Interconnect and topology | Mellanox EDR InfiniBand, 100 Gb/s | 2025 | Operator stated | osc.edu |
| Cooling design | Rear door heat exchangersOSC calls it a novel cooling system with rear door heat exchangers; the March 2017 dedication release describes the system as liquid-cooled | 2025 | Operator stated | osc.eduosc.edu |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Job scheduler | Slurm, after a migration from Torque/MoabOSC notes software environment changes as Owens moved from Torque/Moab to Slurm | 2025 | Operator stated | osc.edu |
| Programming and software stack | Intel compilers and MVAPICH2 MPI loaded by default through the module system | 2025 | Operator stated | osc.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | State of Ohio, through the Ohio biennial capital budget | 2017-03 | Operator stated | osc.edu |
| Funding programme | 2014-15 Ohio biennial capital budget: a $12 million appropriation, of which $9.7 million bought the cluster and the rest new storage and data centre upgradesOSC's 2016 research report describes the $12 million in capital funds as also covering upgraded disk storage and infrastructure services | 2017-03 | Operator stated | osc.eduosc.edu |
| Stated cost | 9.7 USD mCluster cost; the wider $12 million appropriation also paid for storage and data centre upgrades | 2017-03 | Operator stated | osc.eduosc.edu |
| Procurement | Built by Dell (PowerEdge servers) with Intel Xeon Broadwell CPUs, DDN storage components, Mellanox EDR interconnects and 160 NVIDIA Tesla P100 GPUs | 2017-03 | Operator stated | osc.eduosc.edu |
The read
Ohio Supercomputer Center's Dell cluster installed in 2016: 824 nodes made of 648 PowerEdge C6320 dense nodes, 160 R730 nodes with NVIDIA Tesla P100 GPUs and 16 R930 analytics nodes, with Xeon E5-2680v4 CPUs on Mellanox EDR InfiniBand and about 750 TFLOPS CPU-only peak. OSC lists 23,392 cores; the TOP500 entry used here shows 22,372 cores, 705.97 TFLOPS Rmax and 324 kW and ranked 273rd in June 2017 after a peak of 203rd in November 2016. OSC reports it was partially decommissioned on 6 January 2025, with remaining nodes scheduled to power down on 3 February 2025.
Timeline
- 2016 First operational source
- 2016-06-06 Owens hardware was physically delivered to OSC source
- 2017-03-29 OSC formally dedicated Owens, whose recently installed 160 NVIDIA Tesla P100 GPUs had raised total peak to about 1.5 PFlop/s from about 750 TFlop/s for the CPUs alone source
- 2017-06 Listed at #273 on the TOP500 (June 2017) source
- 2025-01-06 A partial decommissioning took about two-thirds of the regular compute nodes and half of the GPU nodes, about 60 percent of cores, offline source
- 2025-02 Decommissioned source
- 2025-02-03 The last Owens job ended on 3 February 2025; over its life the cluster ran more than 36 million jobs for 10,284 users in 2,292 projects source
- 2025-05-01 The last Owens components were physically removed from the State of Ohio Computer Center source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Owens at the Ohio Supercomputer Center
Nearby in scale
The machines closest to Owens by Rmax, smaller to larger.
Related systems
Same operator
- Oakley · USA, decommissioned, 2012
- Ascend (OSC) · USA, operational, 2023
- Cardinal · USA, operational, 2024
Same accelerator
- DGX SaturnV · USA, upgraded, 2016
- GOSAT-2 RCF2 · Japan, operational, 2016
- AIST AI Cloud · Japan, operational, 2017
- Cedar (SFU) · Canada, decommissioned, 2017
- CNIC Era-AI · China, operational, 2017
- Comet · USA, decommissioned, 2015
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Intel Xeon E5-2680 v4, Mellanox InfiniBand EDR |
| osc.edu | names system, part and count | Intel Xeon E5-2680 v4, NVIDIA Tesla P100, Mellanox InfiniBand EDR · counts: 160 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.