Supercomputers/Systems/Tezpur
USA · operational · hpc
Tezpur
Also known as LSU Tezpur
Operated by Louisiana State University .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 10.60 TFlop/s
- Rpeak
- 15.36 TFlop/s
- Rmax ÷ Rpeak
- 69.0%
- Cores
- 1,440
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Tezpur, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 10.60 TFlop/s | #71 of 96 · bottom 27% | #287 of 332 · bottom 15% |
| Rmax ÷ Rpeak | 69.0 % | #85 of 96 · bottom 13% | #207 of 331 · bottom 39% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge 1955 blade cluster, 360 compute nodes | Dell Technologies | - | Reported | top500.org |
| CPU | - Intel Xeon dual-core 2.66 GHz, two per node, 720 processors | Intel | 720 reported | Reported | top500.org |
| Storage | Panasas ActiveScale (PanFS) Storage Object storage, blade shelves (1 director + 10 storage blades) 32 TB Panasas high-performance disk | Panasas | - | Reported | top500.org |
The read
Louisiana State University's Dell PowerEdge 1955 blade cluster. LSU's HPC page says Tezpur was delivered on 3 November 2006 and is a 15.3 TFlop/s peak cluster of 360 compute nodes, each with two dual-core 2.66 GHz Xeon processors, 4 GB of memory and a 10 Gb/s InfiniBand interface, running Red Hat Enterprise Linux 4, with 32 TB of Panasas disk and 21 TB of IBM GPFS storage. TOP500 lists 1,440 cores at 10.60 TFlop/s Rmax and 15.36 TFlop/s Rpeak, rank 134 in November 2007 and 345th in June 2008, its last appearance.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-09 Added Tezpur
Nearby in scale
The machines closest to Tezpur by Rmax, smaller to larger.
Related systems
Same operator
- SuperMike · USA, operational, 2002
- SuperMike-II · USA, operational, 2012
- QB-2 · USA, operational, 2014
- SuperMIC · USA, decommissioned, 2014
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| web.archive.org | names system only | - |
| top500.org | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
Storage and I/O
Parallel file systems, why checkpointing dominates the write load, and the metadata failure mode nobody expects.