Supercomputers/Systems/Chicoma
USA · operational · hpc
Chicoma
Also known as LANL Chicoma
Operated by Los Alamos National Laboratory at Los Alamos Strategic Computing Complex .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX (Cray Windom motherboard) | Hewlett Packard Enterprise | - | Reported | cug.orgfederallabs.org |
| CPU | AMD EPYC 7H12 (Rome, high frequency) CPUs x86-64 · 64C · 2.6 GHz · 7 nm · 280 W AMD EPYC 7H12, two per node, 2.6 GHz base | AMD | - | Reported | cug.orgfederallabs.org |
| Interconnect | - HPE Slingshot interconnect | Hewlett Packard Enterprise | - | Reported | cug.orgfederallabs.org |
The read
Early HPE Cray EX (Shasta) system at Los Alamos bought for DOE Office of Science ASCR under the 2020 CARES Act, for COVID-19 molecular dynamics, epidemiological modelling and bioinformatics. The CUG 2021 acceptance-testing paper describes 512 Slingshot-connected dual-socket AMD EPYC 7H12 compute nodes at that stage, liquid cooled, installed in phases starting from a testbed. A Federal Laboratory Consortium item reports installation in October 2020, more than 73,000 cores, 300 TB of memory and direct-to-chip liquid cooling; The GPU partition is not described in the fetched text. No FLOPS figure or current-status confirmation was found in a fetched source, so none is recorded.
Timeline
No dated events recorded.
Site & facility
Los Alamos Strategic Computing Complex
- Location
- Los Alamos, NM, USA
- Cooling
- Chilled water
- Commissioned
- 1993
Change history
- 2026-10-02 Added Chicoma, Los Alamos's early HPE Cray EX
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| cug.org | does not name this system | - |
| federallabs.org | names system and part | AMD EPYC 7H12 (Rome, high frequency) |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.