Supercomputers/Systems/QTS Cambois Campus (Blyth)
United Kingdom · under construction · mixed
QTS Cambois Campus (Blyth)
Also known as Blyth data centre campus
Operated by QTS Data Centers at Former Blyth Power Station Site .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - QTS builds up to ten data center buildings, 720 MW targeted, on the former Blyth Power Station site | QTS Data Centers | - | Reported | silicon.co.ukgov.uk |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| IT power | 720 MW | 2026-06 | Design target | Total targeted compute capacity across up to ten buildings; single trade report | silicon.co.uk |
The read
QTS's hyperscale campus on the former Blyth Power Station site at Cambois, Northumberland, inside the North East AI Growth Zone. Silicon UK (23 June 2026) describes up to ten data center buildings on 540,000 square metres with a total targeted compute capacity of 720 MW; that MW figure comes from a single trade report, while the UK government release gives only 1.1 GW for the whole AI Growth Zone (Blyth plus Cobalt Park). GOV.UK quotes Blackstone's 10 billion pound commitment to the Blyth campus and an opening in 2028. A separate 2026 application for a data centre at West Sleekburn, under two miles away, would add fuel-cell powered capacity and is not part of this row. No tenant, accelerator type or count has been announced. For the neighbouring zone site see stargate-uk-cobalt-park.
Timeline
No dated events recorded.
Site & facility
Change history
- 2026-10-17 Added QTS Cambois Campus (Blyth) (QTS Data Centers)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| gov.uk | names system only | - |
| silicon.co.uk | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.