Supercomputers/Systems/TEIDE-HPC
Spain · decommissioned · hpc
TEIDE-HPC
Operated by ITER Tenerife .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 273.97 TFlop/s
- Rpeak
- 340.79 TFlop/s
- Rmax ÷ Rpeak
- 80.4%
- Cores
- 16,384
- Power
- 312 kW
- Per watt
- 0.9 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of TEIDE-HPC, and those in Spain. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 273.97 TFlop/s | #152 of 227 · bottom 34% | #6 of 10 · bottom 45% |
| Energy efficiency | 0.9 GF/W | #122 of 186 · bottom 36% | - |
| Rmax ÷ Rpeak | 80.4 % | #106 of 226 · top 47% | #5 of 9 · top 50% |
| Power draw | 312 kW | #131 of 188 · bottom 31% | - |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Fujitsu PRIMERGY CX250 S1, built with Atos | Fujitsu | - | Reported | top500.orginfo.archives.global.fujitsu |
| CPU | Intel Xeon E5-2670 CPUs x86-64 · 8C · 2.6 GHz · 32 nm · 115 W Xeon E5-2670 8C 2.6GHz | Intel | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand QDR Interconnect Fat tree · 40 Gb/s per 4x port InfiniBand QDR | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What TEIDE-HPC runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Total memory | 32 TBITER describes the system commissioned in 2013 as having about 18,000 CPU cores and 32 TB of RAM | 2013 | Operator stated | iter.es |
| Storage capacity | 2.6 PBNetApp storage, net capacity in a redundant cluster configuration with global spare disks | 2026-11 | Operator stated | doc.hpc.iter.es |
| Interconnect and topology | 100 Gbps InfiniBand EDR computing network, with separate storage, management and out-of-band networksTOP500's 2013 entry lists InfiniBand QDR | 2026-11 | Operator stated | doc.hpc.iter.estop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | NetApp storage of 2.6 PB net plus Lustre parallel storage for I/O-intensive work | 2026-11 | Operator stated | doc.hpc.iter.es |
| Programming and software stack | CentOS with Intel Composer XE 2013 SP1, Intel MKL 11.1 and Intel MPI 4.1 Update 1 (HPL run)TOP500 list entry | 2013-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Atos handled construction, supply, installation and operation, with Fujitsu Spain as infrastructure supplier | 2013-12-12 | Vendor stated | info.archives.global.fujitsu |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Run by ITER for researchers, companies at the Tenerife Science and Technology Park and the University of La Laguna, with requests through ITER's TeideHPC service (teidehpc.iter.es)Fujitsu's 2013 release names Canary Islands researchers, island companies and the Universidad de La Laguna as users | 2026-11 | Operator stated | doc.hpc.iter.esinfo.archives.global.fujitsu |
The read
Fujitsu PRIMERGY CX250 S1 cluster with Xeon E5-2670 8-core 2.6 GHz CPUs and InfiniBand QDR, installed by Atos and Fujitsu Spain for the Instituto Tecnologico y de Energias Renovables (ITER) in Tenerife. Fujitsu's December 2013 release puts it at 274 TFLOPS Rmax, the second most powerful supercomputer in Spain, with its power supplied partly by ITER-managed solar panels and wind turbines; TOP500 gives 273.97 TFLOPS, 16,384 cores and 312 kW. It debuted 139th on the November 2013 list and was 169th in June 2014. No retirement date appears in the pages we cited, so the status date is the data refresh.
Timeline
- 2013-11 First operational source
- 2014-06 Listed at #169 on the TOP500 (June 2014) source
- 2021 ITER's EUR 793,427 TeideHPC upgrade and capacity-expansion project, focused on GPUs, ran from January 2020 to December 2021 with a FEDER refundable advance of EUR 674,413 source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Status: Decommissioned as recorded against ITER's current documentation still lists more than 500 of the original E5-2670 nodes in service alongside new GPU nodes. Left unchanged until one source is confirmed.
Change history
- 2026-10-02 Added TEIDE-HPC at ITER in Tenerife
Nearby in scale
The machines closest to TEIDE-HPC by Rmax, smaller to larger.
- Todi · Switzerland, decommissioned · 0.27 PFlop/s
- Laure · France, operational · 0.27 PFlop/s
- Zeus (Cyfronet) · Poland, operational · 0.27 PFlop/s
- JUROPA · Germany, decommissioned · 0.27 PFlop/s
- Tachyon II · South Korea, decommissioned · 0.27 PFlop/s
- ABACUS I · Mexico, operational · 0.28 PFlop/s
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| info.archives.global.fujitsu | names system only | - |
| top500.org | names system and part | Intel Xeon E5-2670, Mellanox InfiniBand QDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.