COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/Bitdeer AI Johor (A202)

Malaysia · planned · ai training

Bitdeer AI Johor (A202)

Also known as Bitdeer AI Johor Bahru GB300

Operated by Bitdeer at Johor Bahru A201-A202 Campus .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Bitdeer AI 10-year services agreement for the 65.1 MW A202 facility in Johor Bahru
Bitdeer
- Reported baxtel.com
Accelerator NVIDIA GB300 NVL72
Accelerators
NVIDIA GB300 NVL72 systems, liquid cooled
NVIDIA - Reported baxtel.com

The read

Bitdeer AI signed a 10-year data center services agreement in September 2026 for the 65.1 MW A202 facility in Johor Bahru, Malaysia, liquid cooled and hosting NVIDIA GB300 NVL72 systems; the neighbouring 21.7 MW A201 is already secured and scheduled for service in January 2027, giving a Johor campus total of 86.8 MW. Bitdeer AI reports about 206.5 MW secured across Malaysia, Norway and the US and a target of 350 MW by the first quarter of 2028. The article does not name the facility's owner or an A202 service date, and no GPU count is given. Single trade source (Baxtel, 18 September 2026).

Timeline

Site & facility

Johor Bahru A201-A202 Campus

Location
Johor Bahru, Malaysia
Cooling
Liquid cooled

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
baxtel.comnames system and partNVIDIA GB300 NVL72

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.