Bitdeer AI Johor (A202)
Also known as Bitdeer AI Johor Bahru GB300
Operated by Bitdeer at Johor Bahru A201-A202 Campus .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Bitdeer AI 10-year services agreement for the 65.1 MW A202 facility in Johor Bahru | Bitdeer | - | Reported | baxtel.com |
| Accelerator | NVIDIA GB300 NVL72 Accelerators NVIDIA GB300 NVL72 systems, liquid cooled | NVIDIA | - | Reported | baxtel.com |
The read
Bitdeer AI signed a 10-year data center services agreement in September 2026 for the 65.1 MW A202 facility in Johor Bahru, Malaysia, liquid cooled and hosting NVIDIA GB300 NVL72 systems; the neighbouring 21.7 MW A201 is already secured and scheduled for service in January 2027, giving a Johor campus total of 86.8 MW. Bitdeer AI reports about 206.5 MW secured across Malaysia, Norway and the US and a target of 350 MW by the first quarter of 2028. The article does not name the facility's owner or an A202 service date, and no GPU count is given. Single trade source (Baxtel, 18 September 2026).
Timeline
- 2026-09 Announced source
Site & facility
Change history
- 2026-10-17 Added Bitdeer AI Johor (A202) (Bitdeer)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| baxtel.com | names system and part | NVIDIA GB300 NVL72 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.