Supercomputers/Systems/DataVolt Oxagon AI Campus
Saudi Arabia · under construction · ai training
DataVolt Oxagon AI Campus
Also known as DataVolt NEOM AI data center; HUMAIN DataVolt Oxagon
Operated by DataVolt at Oxagon Data Centre Site (NEOM) .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - DataVolt develops and operates the 360 MW first phase of the planned 1.5 GW Oxagon campus | DataVolt | - | Reported | data-volt.comneom.com |
| Integrator | - HUMAIN to develop 100 MW of the 360 MW first phase, available from 2028 | HUMAIN | - | Reported | data-volt.comneom.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Facility power | 360 MW | 2026-08 | Design target | First-phase capacity under construction; the announcement does not say whether this is IT or facility load. Full campus planned at 1.5 GW. | data-volt.comneom.com |
The read
An AI data center campus at Oxagon, NEOM's industrial city on Saudi Arabia's Red Sea coast. DataVolt's 31 August 2026 announcement with HUMAIN says construction is under way on a 360 MW first phase of a planned 1.5 GW campus, with HUMAIN to develop 100 MW of it and first capacity available in 2028. Neither fetched page names accelerators or counts, and neither says whether the MW figures are IT or facility load, so only capacity is recorded and no hardware edge is claimed. Both pages come from the same announcement, so the tier stays reported.
Timeline
- 2026-08 Announced source
Site & facility
Change history
- 2026-10-04 Added DataVolt Oxagon AI Campus (DataVolt)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| data-volt.com | names system only | - |
| neom.com | blocked our fetch | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.