COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Rocket Cluster

Estonia · operational · mixed

Rocket Cluster

Also known as UT Rocket

Operated by University of Tartu at University of Tartu HPC Centre .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator -
2 machines with 4x NVIDIA H200 NVL 141GB PCIe each (Firefly nodes), joined by 200 Gbps InfiniBand
NVIDIA 8
reported
Reported hpc.ut.eehpc.ut.ee
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
44 NVIDIA Tesla V100 GPUs (16-32 GB) on Falcon nodes 1-6
NVIDIA 44
reported
Reported hpc.ut.ee
CPU AMD EPYC 7763 (Milan)
CPUs
x86-64 · 64C · 2.45 GHz · 7 nm · 280 W
Artemis nodes 1-20: 2x AMD EPYC 7763 64-core (128 cores per node); Ares nodes use EPYC 7702
AMD - Reported hpc.ut.ee
Storage -
Two GPFS parallel file systems (4.7 PB and 5.9 PB, over 10 PB usable)
IBM - Reported hpc.ut.ee

Engineering, funding and access

What Rocket Cluster runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes50 nodes40 AMD EPYC CPU nodes and 10 GPU nodes, plus 2 login nodes2026-11Operator statedhpc.ut.ee
Storage capacity10.6 PBOur sum of /gpfs/space (4.7 PB) and /gpfs/helios (5.9 PB); the page says over 10 PB usable2026-11Operator statedhpc.ut.ee
Interconnect and topologyInfiniBand fabric with 100 Gb/s links on CPU nodes and 40, 100 or 200 Gb/s links on GPU nodes (some with several links), plus 1 to 40 Gb/s Ethernet to the university network2026-11Operator statedhpc.ut.ee

Software

ItemDetailAs ofBasisSource
Parallel filesystemTwo GPFS file systems, /gpfs/space (4.7 PB) and /gpfs/helios (5.9 PB), using declustered RAID with a transparent flash tier2026-11Operator statedhpc.ut.ee
Job schedulerSlurm2026-11Operator statedhpc.ut.ee
Programming and software stackRed Hat Enterprise Linux 9 on all nodes, with an Open OnDemand web portal2026-11Operator statedhpc.ut.ee

Funding

ItemDetailAs ofBasisSource
Funded byUniversity of Tartu Institute of Computer Science, which funded the falcon V100 GPU nodes2026-11Operator statedhpc.ut.ee

Access

ItemDetailAs ofBasisSource
How researchers get timeUniversity of Tartu users and third parties via ETAIS after an account request; use is billed at EUR 0.012 per core hour, EUR 0.012 per 6 GB of memory per hour and from EUR 0.5 per GPU hour, with storage at EUR 80 per TB per yearRates differ for university units and outside users2026-11Operator statedhpc.ut.ee
Access pagehpc.ut.ee/services/HPC-services/Rocket2026-11Operator statedhpc.ut.ee

The read

The University of Tartu HPC Center's flagship heterogeneous cluster, the main academic HPC and AI resource in Estonia, open to third parties via the national ETAIS system. The centre's own Rocket page lists 50 compute nodes (40 AMD EPYC CPU nodes, 10 GPU nodes) and headline totals of almost 12,000 cores, just over 5 TB of memory and 64 GPUs on 100-200 Gbps InfiniBand, with two GPFS file systems of 4.7 PB and 5.9 PB. GPU nodes carry NVIDIA V100, A100 and, since August 2025, two 4-GPU H200 NVL 141 GB machines bought for Estonian-language model training, linked by 200 Gbps InfiniBand, alongside eight NVIDIA L40S GPUs in the university's cloud. Both cited pages are published by the operator, so confidence is reported; no LINPACK or peak FLOPS figure is published, so FLOPS and an exact core count are left blank.

Timeline

  • 2025-08 Two machines with four NVIDIA H200 NVL GPUs each, linked by 200 Gb/s InfiniBand, were added for training Estonian language models source

Site & facility

Change history

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
hpc.ut.eenames system only-
hpc.ut.eenames system, part and countNVIDIA Tesla V100, AMD EPYC 7763 (Milan) · counts: 44

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading