Supercomputers/Systems/Betzy
Norway · operational · hpc
Betzy
Operated by Sigma2 at Sigma2 (Trondheim) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 4.72 PFlop/s
- Rpeak
- 6.19 PFlop/s
- Rmax ÷ Rpeak
- 76.3%
- Cores
- 172,032
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Betzy, and those in Norway. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 4.72 PFlop/s | #92 of 213 · top 43% | #3 of 10 · top 22% |
| Rmax ÷ Rpeak | 76.3 % | #47 of 209 · top 22% | #7 of 10 · bottom 34% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Atos BullSequana XH2000 | Eviden | - | Verified | documentation.sigma2.notop500.org |
| Accelerator | NVIDIA A100 SXM4 40GB Accelerators CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W 16 NVIDIA A100 40GB GPUs in 4 nodes | NVIDIA | 16 reported | Reported | documentation.sigma2.no |
| CPU | AMD EPYC 7742 (Rome) CPUs x86-64 · 64C · 2.25 GHz · 7 nm · 225 W AMD EPYC 7742 2.25GHz, 1,344 nodes | AMD | - | Verified | documentation.sigma2.notop500.org |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds InfiniBand HDR100, Dragonfly+ | NVIDIA | - | Verified | documentation.sigma2.notop500.org |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid almost all components liquid cooled, 95% of heat captured to water | Eviden | - | Reported | documentation.sigma2.no |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription RHEL 7 | Red Hat | - | Verified | documentation.sigma2.notop500.org |
Engineering, funding and access
What Betzy runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,348 nodes1,344 AMD EPYC 7742 CPU nodes plus 4 NVIDIA A100 GPU nodes; the page also lists 6 preproc nodes with 1 TiB RAM. | 2025 | Operator stated | documentation.sigma2.no |
| Storage capacity | 7.7 PBTotal disc capacity; no filesystem type is given on the page. | 2025 | Operator stated | documentation.sigma2.no |
| Interconnect and topology | InfiniBand HDR100 in a Dragonfly+ topology | 2025 | Operator stated | documentation.sigma2.no |
| Cooling design | Almost all components liquid cooled, with about 95% of the heat captured to water | 2025 | Operator stated | documentation.sigma2.no |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | RHEL 7.7 operating system, Intel ifort, MKL and OpenMPI 3.1.4.3TOP500 submission. | 2026-06 | Operator stated | top500.org |
| Programming and software stack | Red Hat Enterprise Linux 7 operating systemSigma2 page; may lag later upgrades. | 2025 | Operator stated | documentation.sigma2.no |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | BullSequana XH2000 supplied by Atos; contracted operating time of four years with an optional one-year extensionEntered production on 24 November 2020. | 2025 | Operator stated | documentation.sigma2.no |
The read
Norway's national system at NTNU, an Eviden BullSequana XH2000 of 1,344 AMD EPYC 7742 nodes and four NVIDIA A100 nodes on HDR100, put in production on 24 November 2020 and 55th on the June 2020 TOP500 at 4.42 PFlop/s before later runs raised it to 4.72. Sigma2 is the only source for the hardware and dates, and it states a contracted operating life to 2025 that has since been extended by listing. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-09-20 Added with a rank pointer on the edition where it ranked highest
Nearby in scale
The machines closest to Betzy by Rmax, smaller to larger.
- Otus · Germany, operational · 4.66 PFlop/s
- PARAM Siddhi-AI · India, operational · 4.62 PFlop/s
- Tioga · USA, operational · 4.55 PFlop/s
- Cheyenne · USA, decommissioned · 4.79 PFlop/s
- NREL Eagle · USA, decommissioned · 4.85 PFlop/s
- Joule 3.0 · USA, operational · 4.86 PFlop/s
Related systems
Same site
- Saga · Norway, operational, 2019
Same operator
Same accelerator
- Jetstream2 · USA, operational
- JURECA-DC · Germany, operational, 2020
- JUWELS Booster · Germany, operational, 2020
- Lyapunov · Russia, operational, 2020
- PARAM Siddhi-AI · India, operational, 2020
- Pioneer-EUS · USA, operational, 2020
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| documentation.sigma2.no | names system, part and count | AMD EPYC 7742 (Rome), NVIDIA A100 SXM4 40GB, NVIDIA InfiniBand HDR · counts: 16 |
| top500.org | names system, part and count | AMD EPYC 7742 (Rome), NVIDIA InfiniBand HDR · counts: 16 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.