COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Spock

USA · decommissioned · hpc

Spock

Also known as OLCF Spock

Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator -
4x AMD MI100 per node, 144 in total
AMD 144
reported
Reported docs.olcf.ornl.gov
CPU -
1x 64-core AMD EPYC 7662 Rome per node
AMD 36
reported
Reported docs.olcf.ornl.gov
Interconnect HPE Slingshot-10
Interconnect
Dragonfly · 100 Gb/s per port
Slingshot-10, 12.5 GB/s node injection bandwidth
Hewlett Packard Enterprise - Reported docs.olcf.ornl.gov

Engineering, funding and access

What Spock runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes36 nodesThree cabinets of 12 nodes2023-03Operator stateddocs.olcf.ornl.gov
Total memory13.824 TB36 nodes x 256 GB DDR4 = 9.216 TB plus 36 x 4 MI100 x 32 GB HBM2 = 4.608 TB; the guide gives no total2023-03Operator stateddocs.olcf.ornl.gov
Interconnect and topologyHPE Slingshot-10 with 12.5 GB/s node injection; PCIe Gen4 CPU-to-GPU links (32+32 GB/s) and Infinity Fabric xGMI between GPUs (46+46 GB/s)2023-03Operator stateddocs.olcf.ornl.gov

Software

ItemDetailAs ofBasisSource
Parallel filesystemCenter-wide IBM Spectrum Scale (250 PB, 2.5 TB/s peak write, under /gpfs/alpine), NFS home and project areas, and two 3.2 TB node-local NVMe drives per node2023-03Operator stateddocs.olcf.ornl.gov
Job schedulerSlurm, with a 24-node CAAR partition and a 12-node ECP partition2023-03Operator stateddocs.olcf.ornl.gov
Programming and software stackCray (CCE), AMD ROCm (LLVM/Clang based) and GCC compilers through PrgEnv modules, with GPU-aware Cray MPICH2023-03Operator stateddocs.olcf.ornl.gov

Access

ItemDetailAs ofBasisSource
How researchers get timeEarly-access testbed for CAAR and ECP teams, NCCS staff and vendor partners, with separate CAAR and ECP partitions2023-03Operator stateddocs.olcf.ornl.gov

The read

Early-access system for the Frontier programming environment at the OLCF: three cabinets of 12 nodes (36 compute nodes), each with one 64-core AMD EPYC 7662 Rome, 256 GB DDR4, two 3.2 TB NVMe SSDs and four AMD MI100 GPUs (144 GPUs in total), on Slingshot-10 with 12.5 GB/s node injection bandwidth. The OLCF user guide, now an archive, states Spock was decommissioned on March 15, 2023. No FLOPS figures are recorded because none were found in a fetched source.

Timeline

Site & facility

Oak Ridge Leadership Computing Facility

Location
Oak Ridge, TN, USA
Utility
Tennessee Valley Authority
Cooling
Direct liquid cooling (warm water)
Commissioned
1993

Change history

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
docs.olcf.ornl.govnames system and partHPE Slingshot-10

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading