Supercomputers/Systems/Spock
USA · decommissioned · hpc
Spock
Also known as OLCF Spock
Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Accelerator | - 4x AMD MI100 per node, 144 in total | AMD | 144 reported | Reported | docs.olcf.ornl.gov |
| CPU | - 1x 64-core AMD EPYC 7662 Rome per node | AMD | 36 reported | Reported | docs.olcf.ornl.gov |
| Interconnect | HPE Slingshot-10 Interconnect Dragonfly · 100 Gb/s per port Slingshot-10, 12.5 GB/s node injection bandwidth | Hewlett Packard Enterprise | - | Reported | docs.olcf.ornl.gov |
Engineering, funding and access
What Spock runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 36 nodesThree cabinets of 12 nodes | 2023-03 | Operator stated | docs.olcf.ornl.gov |
| Total memory | 13.824 TB36 nodes x 256 GB DDR4 = 9.216 TB plus 36 x 4 MI100 x 32 GB HBM2 = 4.608 TB; the guide gives no total | 2023-03 | Operator stated | docs.olcf.ornl.gov |
| Interconnect and topology | HPE Slingshot-10 with 12.5 GB/s node injection; PCIe Gen4 CPU-to-GPU links (32+32 GB/s) and Infinity Fabric xGMI between GPUs (46+46 GB/s) | 2023-03 | Operator stated | docs.olcf.ornl.gov |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Center-wide IBM Spectrum Scale (250 PB, 2.5 TB/s peak write, under /gpfs/alpine), NFS home and project areas, and two 3.2 TB node-local NVMe drives per node | 2023-03 | Operator stated | docs.olcf.ornl.gov |
| Job scheduler | Slurm, with a 24-node CAAR partition and a 12-node ECP partition | 2023-03 | Operator stated | docs.olcf.ornl.gov |
| Programming and software stack | Cray (CCE), AMD ROCm (LLVM/Clang based) and GCC compilers through PrgEnv modules, with GPU-aware Cray MPICH | 2023-03 | Operator stated | docs.olcf.ornl.gov |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Early-access testbed for CAAR and ECP teams, NCCS staff and vendor partners, with separate CAAR and ECP partitions | 2023-03 | Operator stated | docs.olcf.ornl.gov |
The read
Early-access system for the Frontier programming environment at the OLCF: three cabinets of 12 nodes (36 compute nodes), each with one 64-core AMD EPYC 7662 Rome, 256 GB DDR4, two 3.2 TB NVMe SSDs and four AMD MI100 GPUs (144 GPUs in total), on Slingshot-10 with 12.5 GB/s node injection bandwidth. The OLCF user guide, now an archive, states Spock was decommissioned on March 15, 2023. No FLOPS figures are recorded because none were found in a fetched source.
Timeline
- 2023-03-15 Decommissioned source
Site & facility
Oak Ridge Leadership Computing Facility
- Location
- Oak Ridge, TN, USA
- Utility
- Tennessee Valley Authority
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1993
Change history
- 2026-10-02 Added Spock, OLCF's first Frontier early-access system
Related systems
Same site
- Crusher · USA, decommissioned
- ORNL Paragon XP/S 35 · USA, operational, 1992
- Intel Paragon XP/S 150 · USA, decommissioned, 1995
- Cheetah (ORNL) · USA, decommissioned, 2002
- Phoenix (ORNL) · USA, decommissioned, 2003
- Jaguar · USA, upgraded, 2009
Same operator
- Titan · USA, decommissioned, 2012
- Summit · USA, decommissioned, 2018
- Andes (OLCF) · USA, decommissioned, 2020
- Frontier TDS · USA, operational, 2021
- Frontier · USA, upgraded, 2022
- Discovery (ORNL) · USA, planned
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| docs.olcf.ornl.gov | names system and part | HPE Slingshot-10 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.